Project intelligenceTDLR TABS2019008828Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2018 Bond Program, High School Additions

920 E Hubbard, Lindale, TX, 75771

Construction complete · Aug 2020Project Closed

2018 Bond Program, High School Additions is a additions to existing building project at 920 E Hubbard, Lindale, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $24.4M across about 111,595 sq ft.

Estimated project value
$24.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
111,595 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$219/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 8, 2019487 days across supplied datesAug 7, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    452 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75771 (Lindale)

One email per change. Unsubscribe in one click. Privacy.

2018 Bond Program, High School Additions is a Additions to Existing Building project located at 920 E Hubbard, Lindale, TX 75771 in Lindale, Texas. The project has an estimated value of $24.4M covering 111,595 sq ft. Lindale ISD is the property owner and Harris Craig Architects, Inc. is the design firm of record. The project was registered with TDLR on April 8, 2019.

Frequently Asked Questions

What is 2018 Bond Program, High School Additions?

2018 Bond Program, High School Additions is a additions to existing building project at 920 E Hubbard in Lindale, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project includes the addition of an approximate 3,193 SF kitchen addition, the addition of an approximate 38,380 SF two story classroom addition, a new 12,033 SF gymnasium building, and a new 61,182 SF multi-purpose athletic complex.

Is 2018 Bond Program, High School Additions open in Lindale?

Construction on 2018 Bond Program, High School Additions is complete — TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.

Where is 2018 Bond Program, High School Additions located?

2018 Bond Program, High School Additions is located at 920 E Hubbard, Lindale, TX, 75771, in Smith County.

Who is the owner or developer of 2018 Bond Program, High School Additions?

Lindale ISD is the property owner/developer of record for 2018 Bond Program, High School Additions, per its TDLR project registration.

Who is the architect or design firm for 2018 Bond Program, High School Additions?

Harris Craig Architects, Inc. is the design firm of record for 2018 Bond Program, High School Additions, according to its TDLR filing.

How much does 2018 Bond Program, High School Additions cost and how big is it?

2018 Bond Program, High School Additions has an estimated construction value of $24.4M and approximately 111,595 square feet (about $219/sqft), based on its TDLR filing.

Scope of Work

The project includes the addition of an approximate 3,193 SF kitchen addition, the addition of an approximate 38,380 SF two story classroom addition, a new 12,033 SF gymnasium building, and a new 61,182 SF multi-purpose athletic complex.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

920 E Hubbard, Lindale, TX, 75771

Location by street address

Watch all construction in 75771 (Lindale)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.