Toyota Paint Shop HP Pump Installation

1 Lone Star Pass, San Antonio, TX, 78264

Target date passed (Jun 2019)Review Complete

Toyota Paint Shop HP Pump Installation is a renovation/alteration project at 1 Lone Star Pass, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $155K across about 4,950 sq ft.

Estimated project value
$155K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,950 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$31/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 12, 201952 days across supplied datesJun 3, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    17 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Toyota Paint Shop HP Pump Installation

Toyota Motor Manufacturing registered a $155,000 renovation project with the Texas Department of Licensing and Regulation (TDLR) in April 2019. The work, filed as the Toyota Paint Shop HP Pump Installation, covers 4,950 square feet at 1 Lone Star Pass in San Antonio’s South Side. The scope involves providing fire protection for a newly installed high-pressure (HP) pump and two existing HP pumps, along with a blasting booth. Electrical and plumbing piping extensions support this equipment.

Project Scope and Design

Cleary Zimmermann Engineers serves as the design firm of record for this privately funded project. The filing specifies that the renovation includes extending electrical and plumbing systems to support the HP pumps and blasting booth. This infrastructure upgrade is part of a broader effort to maintain and enhance the manufacturing facility’s operational capabilities. The project is situated on private land for private use, distinct from public infrastructure improvements.

The estimated cost of $155,000 places this project below the median estimated cost of $250,000 for renovation and alteration filings in Bexar County. The scheduled build window of 35 days is shorter than the county median of 103 days. The cost per square foot is $31, which is below the county median of $85. These figures reflect a focused, efficient scope of work rather than a large-scale expansion.

Construction Status and Records

TDLR completed plan review in April 2019, and construction was scheduled to finish in June 2019. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The project remains in a status where the final completion is not verified through the licensing agency’s records. This lack of a final inspection record means that while the scheduled completion date has passed, the official confirmation of the work’s completion is absent from the TDLR database.

Toyota Motor MFG TX INC, the owner of record, has two other TDLR-registered projects in San Antonio totaling $2,000,000. One project, Toyota Motor Manufacturing Texas, is marked as inspection complete, while the other, Toyota Vehicle Logistics Services, is closed. The design firm, Cleary Zimmermann Engineers, has worked on six other projects totaling $6,621,671, including various libraries and educational facilities in the San Antonio area. This indicates a consistent relationship between the owner and the design firm for infrastructure and facility improvements.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78264 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

Toyota Paint Shop HP Pump Installation is a Renovation/Alteration project located at 1 Lone Star Pass, San Antonio, TX 78264 in San Antonio, Texas. The project has an estimated value of $155K covering 4,950 sq ft. TOYOTA MOTOR MFG TX INC is the property owner and Cleary Zimmermann Engineers is the design firm of record. The project was registered with TDLR on April 12, 2019.

Frequently Asked Questions

What is the specific scope of work for this project?

The scope includes providing fire protection for a new HP pump, two existing HP pumps, and a blasting booth. It also involves extending electrical and plumbing piping to support this equipment.

Is the project finished?

TDLR has not yet recorded a final inspection. Although construction was scheduled to finish in June 2019, the public record does not confirm the current state of the site.

Who is the design firm for this project?

Cleary Zimmermann Engineers is the design firm of record for this renovation project at the Toyota Motor Manufacturing facility.

How does this project's cost compare to others in Bexar County?

The $155,000 estimated cost is below the county median of $250,000 for similar renovation filings. The $31 per square foot cost is also below the county median of $85.

What is Toyota Paint Shop HP Pump Installation?

Toyota Paint Shop HP Pump Installation is a renovation/alteration project at 1 Lone Star Pass in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project scope consists of providing fire protection for a newly installed hp pump and two existing hp pumps as well as a blasting booth.Electrical and plumbing piping will also be extended to support hp pumps and blasting booth.

Is Toyota Paint Shop HP Pump Installation open in San Antonio?

Toyota Paint Shop HP Pump Installation was scheduled to finish construction in Jun 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Toyota Paint Shop HP Pump Installation located?

Toyota Paint Shop HP Pump Installation is located at 1 Lone Star Pass, San Antonio, TX, 78264, in Bexar County.

Who is the owner or developer of Toyota Paint Shop HP Pump Installation?

TOYOTA MOTOR MFG TX INC is the property owner/developer of record for Toyota Paint Shop HP Pump Installation, per its TDLR project registration.

Who is the architect or design firm for Toyota Paint Shop HP Pump Installation?

Cleary Zimmermann Engineers is the design firm of record for Toyota Paint Shop HP Pump Installation, according to its TDLR filing.

How much does Toyota Paint Shop HP Pump Installation cost and how big is it?

Toyota Paint Shop HP Pump Installation has an estimated construction value of $155K and approximately 4,950 square feet (about $31/sqft), based on its TDLR filing.

Scope of Work

The project scope consists of providing fire protection for a newly installed hp pump and two existing hp pumps as well as a blasting booth.Electrical and plumbing piping will also be extended to support hp pumps and blasting booth.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1 Lone Star Pass, San Antonio, TX, 78264

Location by street address

Related City Permits

Building permits found at or near this location

1 LONE STAR PASS, City of San Antonio, TX 78264

TMMTX 800 MCC + Maintenance Break Room

IssuedExistingExistingAug 2026
SAT-COM-RML-PMT26-40000528
1 LONE STAR PASS, City of San Antonio, TX 78264

Tank Farm 505A

IssuedComm Foundation PermitNewAug 2026
$1.0M
SAT-COM-FND-PMT26-40300016
1 LONE STAR PASS, City of San Antonio, TX 78264

EXPRESS-SP-Site Work- Toyota Tank Farm 505A-1 LONE STAR PASS

IssuedElectrical General PermitNewAug 2026
SAT-COM-SIT-PMT26-40100314
1 LONE STAR PASS, City of San Antonio, TX 78264

Bldg 800 Dom Water to Emergency Showers

IssuedPlumbing General PermitAug 2026
SAT-MEP-PLM-PMT26-34321870
1 LONE STAR PASS, City of San Antonio, TX 78264

TMMTX Project Plan B

IssuedPlumbing Gas PermitJul 2026
SAT-MEP-GAS-PMT26-34221201

Watch all construction in 78264 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.