Stone Ridge Phase 2
FM 508 @ State Hwy. 6, Navasota, TX, 77868
Stone Ridge Phase 2 is a new construction project at FM 508 @ State Hwy. 6, Navasota, in Grimes County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $85K across about 17,000 sq ft.
- Estimated project value
- $85K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 17,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $5/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
21 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
153 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77868 (Navasota)
One email per change. Unsubscribe in one click. Privacy.
Stone Ridge Phase 2 is a New Construction project located at FM 508 @ State Hwy. 6, Navasota, TX 77868 in Navasota, Texas. The project has an estimated value of $85K covering 17,000 sq ft. Westwick Construction, LP-Patrick Johnson is the property owner and Michael G. Hester, PE is the design firm of record. The project was registered with TDLR on April 24, 2019.
Frequently Asked Questions
What is Stone Ridge Phase 2?
Stone Ridge Phase 2 is a new construction project at FM 508 @ State Hwy. 6 in Navasota, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks, curb ramps and crosswalks in a residential subdivision
Is Stone Ridge Phase 2 open in Navasota?
Stone Ridge Phase 2 was scheduled to finish construction in Oct 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Stone Ridge Phase 2 located?
Stone Ridge Phase 2 is located at FM 508 @ State Hwy. 6, Navasota, TX, 77868, in Grimes County.
Who is the owner or developer of Stone Ridge Phase 2?
Westwick Construction, LP-Patrick Johnson is the property owner/developer of record for Stone Ridge Phase 2, per its TDLR project registration.
Who is the architect or design firm for Stone Ridge Phase 2?
Michael G. Hester, PE is the design firm of record for Stone Ridge Phase 2, according to its TDLR filing.
How much does Stone Ridge Phase 2 cost and how big is it?
Stone Ridge Phase 2 has an estimated construction value of $85K and approximately 17,000 square feet (about $5/sqft), based on its TDLR filing.
Scope of Work
Sidewalks, curb ramps and crosswalks in a residential subdivision
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
FM 508 @ State Hwy. 6, Navasota, TX, 77868
Watch all construction in 77868 (Navasota)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Navasota?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.