UNTUCK IT
UNTUCK IT is a renovation/alteration project at 1414 MAIN ST, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $233K across about 1,165 sq ft.
๐Project Metrics
TDLR #TABS2019010248Project Closed
Project has been completed and closed
UNTUCK IT is a Renovation/Alteration project located at 1414 MAIN ST, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $233K covering 1,165 sq ft. RPAI SOUTHWEST MGMT is the property owner and SHREMSHOCK ARCHITECTS is the design firm of record. The project was registered with TDLR on April 26, 2019.
โFrequently Asked Questions
What is UNTUCK IT?
UNTUCK IT is a renovation/alteration project at 1414 MAIN ST in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR ALTERATION OF EXISTING SPACE
Is UNTUCK IT open in Southlake?
Construction on UNTUCK IT is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.
Where is UNTUCK IT located?
UNTUCK IT is located at 1414 MAIN ST, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of UNTUCK IT?
RPAI SOUTHWEST MGMT is the property owner/developer of record for UNTUCK IT, per its TDLR project registration.
Who is the architect or design firm for UNTUCK IT?
SHREMSHOCK ARCHITECTS is the design firm of record for UNTUCK IT, according to its TDLR filing.
How much does UNTUCK IT cost and how big is it?
UNTUCK IT has an estimated construction value of $233K and approximately 1,165 square feet (about $200/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR ALTERATION OF EXISTING SPACE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 26, 2019
Review Complete
Inspection Complete
Closed
Aug 9, 2019