โœ…Inspection Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

CAMBRIA HOTEL

68 EAST AVENUE, Austin, TX 78701, Austin, TX, 78701
Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #TABS2019012617
$10.5M
Project Value
172,000
Square Feet
$61/sqft
Cost/SqFt
3y 7mo
Duration
Registered:May 28, 2019
Start:Oct 1, 2019
Target:Apr 5, 2023
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

๐Ÿ“‹Scope of Work

HOTEL WITH ASSOCIATED PARKING AND AMENITIES

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
May 28, 2019
Inspection Complete
April 5, 2023
Construction Start
October 1, 2019
Expected Completion
April 5, 2023

๐Ÿ“„Related City Permits

Building permits found at or near this location

6801 ESTHER DR

RENOVATION OF KITCHEN AND LIVING SPACES REPLACEMENT OF EXTERIOR SIDING ADDITION OF FRONT PORCH REPLACEMENT OF BACK PORCH.

ActiveMechanical PermitAddition and RemodelFeb 2026
View Details
2025-131043 MP
๐Ÿ”งEhrlich Mechanical
6802 LOST VALLEY

We ran approximately 60 feet of 1-1/4 poly with riser to supply gas to an outdoor pool Heater. Prior to running gas we called Texas gas with a BTU count and was approved to tie in just after the meter. Tracer wire is laid in trench where the poly is laid. We painted all exposed Threaded pipe. An iron body valve is ahead of all the poly and riser and an additional 1/4 turn WOG valve is at the heater. we will be testing the system with compress air at a tee just passed the iron body valve as to not turn off the gas supply to the house. We tried to get this inspected in December but were slowed due to existing and expired permits from other contractors now that all has been passed we are seeking an inspection and permission to turn on the supply to the pool heater and cover the entire trench. The homeowner covered the trench but left the risers exposed. He was concerned as he had an employee Christmas party and didnt want anyone to trip on the excavation. I do have pictures and the depth of the poly is at 20 to the top of the pipe. Approximately 55 bags of all-purpose sand were used to bed (and cover) the poly before it was partially backfilled. Dig TESS was called before and excavation from a third party hired by the homeowner began excavation. Thank you Kindley and my apologies if we had a missed inspection. My name is Mike my phone number is 512-909-9442. please call me if there are any concerns or anything I missed that needs addressed.

ActivePlumbing PermitRepairFeb 2026
View Details
2026-010234 PP
๐Ÿ”งGardenHouse Plumbing Co
6808 S IH 35 SVRD SB BLDG 7

Exterior structural repair to landing at Bldg 7.

ActiveBuilding PermitRemodelFeb 2026
View Details
2025-139023 BP
๐Ÿ”งITALEX BUILDERS INC ***MAIN
6801 JESTER BLVD

Replacement of existing deck siding and roof. Partial raising of interior floor. Remodel of deck to match height of interior/avoid entry steps. Slight increase in sqft to accommodate new floor height and deck interface. 2 new 1st floor storage room additions (enclosing courtyard between house and garage

ActiveBuilding PermitAddition and RemodelFeb 2026
$1
View Details
2025-160128 BP
๐Ÿ”งSanctuary Builders of Texas, Inc
6805 TULANE DR

Interior remodel new windows remove structurally substandard screened porch.

ActiveElectrical PermitAddition and RemodelFeb 2026
View Details
2025-157093 EP
๐Ÿ”งKJ Electric Company Inc

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists