Project intelligenceTDLR TABS2019012977New Construction
Funding type

This project is privately funded, on private land for private use.

Interceramic Finish-out

Building Six Suite 600, Austin, TX, 78728

Construction complete · Sep 2019Project Closed

Interceramic Finish-out is a new construction project at Building Six Suite 600, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2019). The project has an estimated value of $450K across about 38,400 sq ft.

Estimated project value
$450K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
38,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 3, 2019119 days across supplied datesSep 30, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    84 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78728 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Interceramic Finish-out is a New Construction project located at Building Six Suite 600, Austin, TX 78728 in Austin, Texas. The project has an estimated value of $450K covering 38,400 sq ft. LIT Industrial Texas Limited Partnership is the property owner and TAG International LLP is the design firm of record. The project was registered with TDLR on June 3, 2019.

Frequently Asked Questions

What is Interceramic Finish-out?

Interceramic Finish-out is a new construction project at Building Six Suite 600 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Office / Showroom / Warehouse Finish-out

Is Interceramic Finish-out open in Austin?

Construction on Interceramic Finish-out is complete — TDLR records show the project passed its required accessibility inspection in Sep 2019. The building is finished and very likely open.

Where is Interceramic Finish-out located?

Interceramic Finish-out is located at Building Six Suite 600, Austin, TX, 78728, in Travis County.

Who is the owner or developer of Interceramic Finish-out?

LIT Industrial Texas Limited Partnership is the property owner/developer of record for Interceramic Finish-out, per its TDLR project registration.

Who is the architect or design firm for Interceramic Finish-out?

TAG International LLP is the design firm of record for Interceramic Finish-out, according to its TDLR filing.

How much does Interceramic Finish-out cost and how big is it?

Interceramic Finish-out has an estimated construction value of $450K and approximately 38,400 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Office / Showroom / Warehouse Finish-out

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Building Six Suite 600, Austin, TX, 78728

Location by street address

Watch all construction in 78728 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.