Project intelligenceTDLR TABS2019013154New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Red River NETT East

Red River Trail, Clarksville, TX, 75426

Construction complete · Jun 2021Project Closed

Red River NETT East is a new construction project at Red River Trail, Clarksville, in Red River County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2021). The project has an estimated value of $632K across about 324,470 sq ft.

Estimated project value
$632K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
324,470 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 15, 2019809 days across supplied datesJun 1, 2021

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    81 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    728 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75426 (Clarksville)

One email per change. Unsubscribe in one click. Privacy.

Red River NETT East is a New Construction project located at Red River Trail, Clarksville, TX 75426 in Clarksville, Texas. The project has an estimated value of $632K covering 324,470 sq ft. Red River County is the property owner and Hayter Engineering, Inc. is the design firm of record. The project was registered with TDLR on June 4, 2019.

Frequently Asked Questions

What is Red River NETT East?

Red River NETT East is a new construction project at Red River Trail in Clarksville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish construction of 10' wide shared use path by installing flex base & surfacing on one of two contiguous sections of rail banked corridor (Northeast Texas Trail) in Red River County.

Is Red River NETT East open in Clarksville?

Construction on Red River NETT East is complete — TDLR records show the project passed its required accessibility inspection in Jun 2021. The building is finished and very likely open.

Where is Red River NETT East located?

Red River NETT East is located at Red River Trail, Clarksville, TX, 75426, in Red River County.

Who is the owner or developer of Red River NETT East?

Red River County is the property owner/developer of record for Red River NETT East, per its TDLR project registration.

Who is the architect or design firm for Red River NETT East?

Hayter Engineering, Inc. is the design firm of record for Red River NETT East, according to its TDLR filing.

How much does Red River NETT East cost and how big is it?

Red River NETT East has an estimated construction value of $632K and approximately 324,470 square feet (about $2/sqft), based on its TDLR filing.

Scope of Work

Finish construction of 10' wide shared use path by installing flex base & surfacing on one of two contiguous sections of rail banked corridor (Northeast Texas Trail) in Red River County.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Red River Trail, Clarksville, TX, 75426

33.61066, -95.05272

Watch all construction in 75426 (Clarksville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Clarksville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.