Funding type
This project is privately funded, on private land for private use.
Houston Methodist Hospital Dunn B1 Linear Accelerator Study
6565 Fannin - Basement 1 Level, Houston, TX, 77030
Houston Methodist Hospital Dunn B1 Linear Accelerator Study is a renovation/alteration project at 6565 Fannin - Basement 1 Level, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2020). The project has an estimated value of $645K across about 2,360 sq ft.
- Estimated project value
- $645K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,360 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $273/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
23 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
499 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77030 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Houston Methodist Hospital Dunn B1 Linear Accelerator Study is a Renovation/Alteration project located at 6565 Fannin - Basement 1 Level, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $645K covering 2,360 sq ft. Houston Methodist is the property owner and HDR is the design firm of record. The project was registered with TDLR on June 18, 2019.
Frequently Asked Questions
What is Houston Methodist Hospital Dunn B1 Linear Accelerator Study?
Houston Methodist Hospital Dunn B1 Linear Accelerator Study is a renovation/alteration project at 6565 Fannin - Basement 1 Level in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Professional services for the Replacement of the existing Varian equipment including MEP upgrades and upgraded finishes at Dunn B1-071 (and Annex 192 and Annex 193).
Is Houston Methodist Hospital Dunn B1 Linear Accelerator Study open in Houston?
Construction on Houston Methodist Hospital Dunn B1 Linear Accelerator Study is complete — TDLR records show the project passed its required accessibility inspection in Nov 2020. The building is finished and very likely open.
Where is Houston Methodist Hospital Dunn B1 Linear Accelerator Study located?
Houston Methodist Hospital Dunn B1 Linear Accelerator Study is located at 6565 Fannin - Basement 1 Level, Houston, TX, 77030, in Harris County.
Who is the owner or developer of Houston Methodist Hospital Dunn B1 Linear Accelerator Study?
Houston Methodist is the property owner/developer of record for Houston Methodist Hospital Dunn B1 Linear Accelerator Study, per its TDLR project registration.
Who is the architect or design firm for Houston Methodist Hospital Dunn B1 Linear Accelerator Study?
HDR is the design firm of record for Houston Methodist Hospital Dunn B1 Linear Accelerator Study, according to its TDLR filing.
How much does Houston Methodist Hospital Dunn B1 Linear Accelerator Study cost and how big is it?
Houston Methodist Hospital Dunn B1 Linear Accelerator Study has an estimated construction value of $645K and approximately 2,360 square feet (about $273/sqft), based on its TDLR filing.
Scope of Work
Professional services for the Replacement of the existing Varian equipment including MEP upgrades and upgraded finishes at Dunn B1-071 (and Annex 192 and Annex 193).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6565 Fannin - Basement 1 Level, Houston, TX, 77030
Related Projects
Same Owner
$4.3M totalRelated City Permits
Building permits found at or near this location
2,109 SF. HOSPITAL SECUR OFC REMOD. (2/3) 1-12-1-I2-A 2021 IBC SPK
4,108 SF. HOSPITAL OFFICE REMODEL (M/3) 1-12-1-I2-A 2021 IBC SPK
5,150 SF. HOSPITAL EQUIPMENT RMD 1-13-1-I2-A 2021 IBC SPK/FA
4,745 SF HOSPITAL REMODEL (S4) 1-11-1-B-A '21 IBC SPK/FA
2,500SF HISTOLOGY LAB BUILDOUT 1-11-1-I2-A 2021 IBC SPK/FA
Watch all construction in 77030 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.