Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Hearne Public Safety Building
306 W 3rd St, Hearne, TX, 77859
Hearne Public Safety Building is a new construction project at 306 W 3rd St, Hearne, in Robertson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2020). The project has an estimated value of $7.0M across about 25,750 sq ft.
- Estimated project value
- $7.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 25,750 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $272/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
88 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
336 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About Hearne Public Safety Building
The City of Hearne constructed a new 25,750-square-foot public safety building at 306 W 3rd St in Robertson County. This facility houses the fire department, police department, and city council chambers, representing a significant addition to the local infrastructure in the community of approximately 7,516 residents. The project involved a total estimated cost of $7,000,000, which translates to a construction cost of $272 per square foot.
Burditt Consultants, LLC served as the design firm of record for this new construction project. Tim Mullins was the registered accessibility specialist responsible for the project’s compliance with state standards. The scope of work extended beyond the main structure to include extensive site improvements such as utilities, paving, sidewalks, landscape, and irrigation systems. This comprehensive approach ensured the building was integrated fully into the existing urban environment of Hearne.
The construction timeline spanned from October 2019 to September 2020, a period of 336 days. This duration is longer than the median scheduled build window of 258 days for similar new construction projects in Robertson County. The estimated cost of $7,000,000 places this project in the top quarter of costs for new construction filings in the county, exceeding the median estimated cost of $900,000. Similarly, the $272 per square foot cost is above the county median of $212 per square foot, reflecting the specialized nature of public safety facilities.
Project Status and Local Context
TDLR closed the project file in September 2020, which marks the end of the accessibility review process for this construction. This status indicates that the regulatory requirements for the building’s accessibility were finalized at that time. The project involved public funds and public land, underscoring its importance to the City of Hearne’s civic operations. The City of Hearne had one other TDLR-registered project totaling $483,684, but the public safety building remains the most substantial recent investment in the area.
Local media outlets have noted the significance of the new facility. A post by the OfficialCityOfHearne account described the building as serving as a Police Station, Fire Station, Municipal Court, and Council Chambers. KXXV reported an exclusive inside look at the new Hearne public safety building, highlighting its modern features. KBTX also noted that the building houses the Police, Fire Departments, and City Council Chambers. These reports align with the TDLR record, which details the construction of a multi-functional public safety hub.
The completion of this project enhances the City of Hearne’s capacity to serve its residents with dedicated spaces for emergency services and civic governance. The building’s location on West 3rd Street provides central access for the community. With the accessibility review process concluded, the facility stands as a completed asset for Robertson County, meeting the standards set by state regulators for new public construction.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77859 (Hearne)
One email per change. Unsubscribe in one click. Privacy.
Hearne Public Safety Building is a New Construction project located at 306 W 3rd St, Hearne, TX 77859 in Hearne, Texas. The project has an estimated value of $7.0M covering 25,750 sq ft. City of Hearne is the property owner and Burditt Consultants, LLC is the design firm of record. The project was registered with TDLR on July 18, 2019.
Frequently Asked Questions
What is the current status of the Hearne Public Safety Building project?
TDLR closed the project file in September 2020. This marks the end of the accessibility review process for the construction, indicating that the regulatory requirements were finalized at that time.
How much did the construction of the building cost?
The estimated cost for the new construction was $7,000,000. This figure includes the building itself and site improvements such as utilities, paving, and landscaping.
What facilities are housed in the new building?
The building includes facilities for the fire department, police department, and city council. It also serves as a municipal court location according to local city communications.
Who was the design firm for this project?
Burditt Consultants, LLC was the design firm of record. Tim Mullins served as the registered accessibility specialist for the project's TDLR filing.
Is the building open to the public?
The TDLR record confirms the construction project is closed. Local media, such as KBTX, reported that the building opens to house the police, fire, and council chambers, though specific operational hours are not in the construction file.
What is Hearne Public Safety Building?
Hearne Public Safety Building is a new construction project at 306 W 3rd St in Hearne, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: construction of a public safety building including, but not limited to, fire department, police department, and city council facilities, and site improvements including utilities, paving, sidewalks, landscape and irrigation.
Is Hearne Public Safety Building open in Hearne?
Construction on Hearne Public Safety Building is complete — TDLR records show the project passed its required accessibility inspection in Sep 2020. The building is finished and very likely open.
Where is Hearne Public Safety Building located?
Hearne Public Safety Building is located at 306 W 3rd St, Hearne, TX, 77859, in Robertson County.
Who is the owner or developer of Hearne Public Safety Building?
City of Hearne is the property owner/developer of record for Hearne Public Safety Building, per its TDLR project registration.
Who is the architect or design firm for Hearne Public Safety Building?
Burditt Consultants, LLC is the design firm of record for Hearne Public Safety Building, according to its TDLR filing.
How much does Hearne Public Safety Building cost and how big is it?
Hearne Public Safety Building has an estimated construction value of $7.0M and approximately 25,750 square feet (about $272/sqft), based on its TDLR filing.
Scope of Work
construction of a public safety building including, but not limited to, fire department, police department, and city council facilities, and site improvements including utilities, paving, sidewalks, landscape and irrigation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
306 W 3rd St, Hearne, TX, 77859
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$8.4M totalWatch all construction in 77859 (Hearne)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Hearne?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.