Project intelligenceTDLR TABS2019016609New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Stockdale ISD Science Classroom and Gym Addition

503 South Fourth St, Stockdale, TX, 78160

Construction complete · May 2020Project Closed

Stockdale ISD Science Classroom and Gym Addition is a new construction project at 503 South Fourth St, Stockdale, in Wilson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2020). The project has an estimated value of $4.1M across about 19,200 sq ft.

Estimated project value
$4.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
19,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$212/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 22, 2019313 days across supplied datesMay 30, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    46 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    267 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78160 (Stockdale)

One email per change. Unsubscribe in one click. Privacy.

Stockdale ISD Science Classroom and Gym Addition is a New Construction project located at 503 South Fourth St, Stockdale, TX 78160 in Stockdale, Texas. The project has an estimated value of $4.1M covering 19,200 sq ft. Daniel Fuller is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on July 22, 2019.

Frequently Asked Questions

What is Stockdale ISD Science Classroom and Gym Addition?

Stockdale ISD Science Classroom and Gym Addition is a new construction project at 503 South Fourth St in Stockdale, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of a 19,208 sq ft addition consisting of a new one-story building including a middle school gymnasium and stage, a science suite with classrooms and a science lab, and site improvements.

Is Stockdale ISD Science Classroom and Gym Addition open in Stockdale?

Construction on Stockdale ISD Science Classroom and Gym Addition is complete — TDLR records show the project passed its required accessibility inspection in May 2020. The building is finished and very likely open.

Where is Stockdale ISD Science Classroom and Gym Addition located?

Stockdale ISD Science Classroom and Gym Addition is located at 503 South Fourth St, Stockdale, TX, 78160, in Wilson County.

Who is the owner or developer of Stockdale ISD Science Classroom and Gym Addition?

Daniel Fuller is the property owner/developer of record for Stockdale ISD Science Classroom and Gym Addition, per its TDLR project registration.

Who is the architect or design firm for Stockdale ISD Science Classroom and Gym Addition?

O'Connell Robertson is the design firm of record for Stockdale ISD Science Classroom and Gym Addition, according to its TDLR filing.

How much does Stockdale ISD Science Classroom and Gym Addition cost and how big is it?

Stockdale ISD Science Classroom and Gym Addition has an estimated construction value of $4.1M and approximately 19,200 square feet (about $212/sqft), based on its TDLR filing.

Scope of Work

The project consists of a 19,208 sq ft addition consisting of a new one-story building including a middle school gymnasium and stage, a science suite with classrooms and a science lab, and site improvements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

503 South Fourth St, Stockdale, TX, 78160

Location by street address

Watch all construction in 78160 (Stockdale)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Stockdale?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.