Gracie Barra Jiu Jitsu is a renovation/alteration project at 350 Promenade Way, #700, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2019). The project has an estimated value of $75K across about 1,000 sq ft.
Project has been completed and closed
Gracie Barra Jiu Jitsu is a Renovation/Alteration project located at 350 Promenade Way, #700, Sugar Land, TX 77478 in Sugar Land, Texas. The project has an estimated value of $75K covering 1,000 sq ft. Rubicon Realty Group is the property owner and Carter Architects, inc. is the design firm of record. The project was registered with TDLR on August 13, 2019.
Gracie Barra Jiu Jitsu is a renovation/alteration project at 350 Promenade Way, #700 in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Lease space buildout of a gym in a shell retail building on the ground floor.
Construction on Gracie Barra Jiu Jitsu is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2019. The building is finished and very likely open.
Gracie Barra Jiu Jitsu is located at 350 Promenade Way, #700, Sugar Land, TX, 77478, in Fort Bend County.
Rubicon Realty Group is the property owner/developer of record for Gracie Barra Jiu Jitsu, per its TDLR project registration.
Carter Architects, inc. is the design firm of record for Gracie Barra Jiu Jitsu, according to its TDLR filing.
Gracie Barra Jiu Jitsu has an estimated construction value of $75K and approximately 1,000 square feet (about $75/sqft), based on its TDLR filing.
Lease space buildout of a gym in a shell retail building on the ground floor.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 13, 2019
Review Complete
Inspection Complete
Closed
Nov 1, 2019