Project intelligenceTDLR TABS2019019468New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr in Mesquite, TX

100 S. Town East Blvd, Mesquite, TX, 75149

Construction complete · Mar 2020Project Closed

CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr is a new construction project at 100 S. Town East Blvd, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2020). The project has an estimated value of $626K across about 500 sq ft.

Estimated project value
$626K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.25K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 28, 2019215 days across supplied datesMar 30, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    68 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    147 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75149 (Mesquite)

One email per change. Unsubscribe in one click. Privacy.

CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr is a New Construction project located at 100 S. Town East Blvd, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $626K covering 500 sq ft. City of Mesquite; Attn: Wes McClure, P.E. is the property owner and Garver LLC is the design firm of record. The project was registered with TDLR on August 28, 2019.

Frequently Asked Questions

What is CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr?

CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr is a new construction project at 100 S. Town East Blvd in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of Skyline Trail hike and bike trail.

Is CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr open in Mesquite?

Construction on CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr is complete — TDLR records show the project passed its required accessibility inspection in Mar 2020. The building is finished and very likely open.

Where is CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr located?

CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr is located at 100 S. Town East Blvd, Mesquite, TX, 75149, in Dallas County.

Who is the owner or developer of CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr?

City of Mesquite; Attn: Wes McClure, P.E. is the property owner/developer of record for CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr, per its TDLR project registration.

Who is the architect or design firm for CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr?

Garver LLC is the design firm of record for CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr, according to its TDLR filing.

How much does CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr cost and how big is it?

CSJ 0918-47-144 - Skyline Trail - along Town East Blvd from Military to Skyline Dr has an estimated construction value of $626K and approximately 500 square feet (about $1.25K/sqft), based on its TDLR filing.

Scope of Work

Construction of Skyline Trail hike and bike trail.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

100 S. Town East Blvd, Mesquite, TX, 75149

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75149 (Mesquite)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mesquite?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.