Funding type
This project is privately funded, on private land for private use.
Uplift Summit Parking Lot Expansion in Arlington, TX
1123 Altman Dr 1212 Roosevelt Street, Arlington, TX, 76011
Uplift Summit Parking Lot Expansion is a additions to existing building project at 1123 Altman Dr 1212 Roosevelt Street, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $230K across about 30,620 sq ft.
- Estimated project value
- $230K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 30,620 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $8/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
49 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
304 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76011 (Arlington)
One email per change. Unsubscribe in one click. Privacy.
Uplift Summit Parking Lot Expansion is a Additions to Existing Building project located at 1123 Altman Dr 1212 Roosevelt Street, Arlington, TX 76011 in Arlington, Texas. The project has an estimated value of $230K covering 30,620 sq ft. Uplift Education is the property owner and mma, inc. is the design firm of record. The project was registered with TDLR on September 13, 2019.
Frequently Asked Questions
What is Uplift Summit Parking Lot Expansion?
Uplift Summit Parking Lot Expansion is a additions to existing building project at 1123 Altman Dr 1212 Roosevelt Street in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additional parking area for Summit International Preparatory
Is Uplift Summit Parking Lot Expansion open in Arlington?
Construction on Uplift Summit Parking Lot Expansion is complete — TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.
Where is Uplift Summit Parking Lot Expansion located?
Uplift Summit Parking Lot Expansion is located at 1123 Altman Dr 1212 Roosevelt Street, Arlington, TX, 76011, in Tarrant County.
Who is the owner or developer of Uplift Summit Parking Lot Expansion?
Uplift Education is the property owner/developer of record for Uplift Summit Parking Lot Expansion, per its TDLR project registration.
Who is the architect or design firm for Uplift Summit Parking Lot Expansion?
mma, inc. is the design firm of record for Uplift Summit Parking Lot Expansion, according to its TDLR filing.
How much does Uplift Summit Parking Lot Expansion cost and how big is it?
Uplift Summit Parking Lot Expansion has an estimated construction value of $230K and approximately 30,620 square feet (about $8/sqft), based on its TDLR filing.
Scope of Work
Additional parking area for Summit International Preparatory
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1123 Altman Dr 1212 Roosevelt Street, Arlington, TX, 76011
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 76011 (Arlington)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Arlington?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.