USAA
USAA is a renovation/alteration project at 5601 Legacy Dr. Building A LV. 1, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.1M across about 32,491 sq ft.
๐Project Metrics
TDLR #TABS2020001004Review Complete
Design review complete, construction may proceed
USAA is a Renovation/Alteration project located at 5601 Legacy Dr. Building A LV. 1, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $2.1M covering 32,491 sq ft. JDM Legacy TX, LLC is the property owner and PDR is the design firm of record. The project was registered with TDLR on September 16, 2019.
โFrequently Asked Questions
What is USAA?
USAA is a renovation/alteration project at 5601 Legacy Dr. Building A LV. 1 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of one single tenant floor including, mechanical, plumbing and electrical throughout.
Is USAA open in Plano?
USAA is currently under construction in Plano, TX. Its current TDLR status is "Review Complete".
Where is USAA located?
USAA is located at 5601 Legacy Dr. Building A LV. 1, Plano, TX, 75024, in Collin County.
Who is the owner or developer of USAA?
JDM Legacy TX, LLC is the property owner/developer of record for USAA, per its TDLR project registration.
Who is the architect or design firm for USAA?
PDR is the design firm of record for USAA, according to its TDLR filing.
How much does USAA cost and how big is it?
USAA has an estimated construction value of $2.1M and approximately 32,491 square feet (about $65/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of one single tenant floor including, mechanical, plumbing and electrical throughout.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 16, 2019
Review Complete
Sep 16, 2019
Inspection Complete
Closed