Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
US 183 in Breckenridge, TX
On US 183, Breckenridge, TX, 76424
US 183 is a new construction project at On US 183, Breckenridge, in Stephens County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $6.3M across about 55,050 sq ft.
- Estimated project value
- $6.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 55,050 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $115/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
207 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
761 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
1,325 days after the preceding date shown.
Source: TDLR filing
View source record
📰About US 183
The new construction project on US 183 in Breckenridge, Texas, is complete. The TDLR record shows the final TDLR accessibility inspection passed in January 2026, confirming that the physical work described in the filing has concluded. This project, identified in the filing as CSJ: 0404-02-036, involved the construction of sidewalks and ADA ramps along a stretch of the highway.
The scope of work included grading, base preparation, and pavement installation. The registered accessibility specialist for the project was Frank Fonseca. The owner of record is TxDOT District: Brownwood, and the design firm of record is the Texas Department of Transportation. The project was registered with TDLR in October 2019, and plan review was completed in the same month.
Construction began in May 2020. The filing listed a completion date of June 2022, but the record indicates the project remained active until the final inspection in January 2026. The total estimated cost for the project was $6,317,027. The scope covered 55,050 square feet of work, resulting in a cost of $115 per square foot.
Project Context
This project is part of a broader portfolio of work by TxDOT District: Brownwood. The district has six other TDLR-registered projects totaling $21,795,646. These include projects in Brownwood, Eastland, Early, and Rising Star. The Texas Department of Transportation, as the design firm, has six other registered projects totaling $31,537,331. These projects are located in Salado, Georgetown, Sherman, Denton, and McAllen.
In Stephens County, the median estimated cost for new construction filings is $1,000,000. This project’s cost is above the county median for its type. The median size for similar projects in the county is 7,291 square feet, while this project is significantly larger at 55,050 square feet. The median cost per square foot in the county is $195, which is higher than the $115 per square foot for this project. The scheduled build window for this project was 761 days, which is longer than the county median of 245 days.
The project is located in ZIP code 76424. According to U.S. Census ACS 2023 five-year estimates, the population of this area is about 8,626. The median household income is $53,659, and the median owner-occupied home value is $102,200. The housing stock is predominantly owner-occupied. The Stephens County unemployment rate was 4.8 percent in July 2026, according to FRED data. This project represents a significant investment in public infrastructure within the region.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76424 (Breckenridge)
One email per change. Unsubscribe in one click. Privacy.
US 183 is a New Construction project located at On US 183, Breckenridge, TX 76424 in Breckenridge, Texas. The project has an estimated value of $6.3M covering 55,050 sq ft. TxDOT District: Brownwood is the property owner and Texas Department of Transportation is the design firm of record. The project was registered with TDLR on October 7, 2019.
Frequently Asked Questions
Is the project on US 183 in Breckenridge complete?
Yes. The TDLR record indicates the final TDLR accessibility inspection passed in January 2026, confirming construction is complete.
What was the scope of work for the Breckenridge US 183 project?
The scope included construction of sidewalks and ADA ramps, consisting of grading, base, pavement, and related work.
Who is the owner and design firm for this project?
The owner of record is TxDOT District: Brownwood. The design firm of record is the Texas Department of Transportation.
What is the estimated cost and size of the project?
The estimated cost is $6,317,027 for 55,050 square feet of work, which calculates to $115 per square foot.
When did construction start and end?
Construction started in May 2020. The final TDLR accessibility inspection passed in January 2026, marking the completion of the project.
What is US 183?
US 183 is a new construction project at On US 183 in Breckenridge, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalks & ADA ramps, consisting of grading, base, pavement and etc.
Is US 183 open in Breckenridge?
Construction on US 183 is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is US 183 located?
US 183 is located at On US 183, Breckenridge, TX, 76424, in Stephens County.
Who is the owner or developer of US 183?
TxDOT District: Brownwood is the property owner/developer of record for US 183, per its TDLR project registration.
Who is the architect or design firm for US 183?
Texas Department of Transportation is the design firm of record for US 183, according to its TDLR filing.
How much does US 183 cost and how big is it?
US 183 has an estimated construction value of $6.3M and approximately 55,050 square feet (about $115/sqft), based on its TDLR filing.
Scope of Work
Construction of sidewalks & ADA ramps, consisting of grading, base, pavement and etc.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
On US 183, Breckenridge, TX, 76424
Related Projects
Same Owner
$37.03B totalWatch all construction in 76424 (Breckenridge)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Breckenridge?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.