Project Capstone
๐Project Metrics
TDLR #TABS2020002690Project Closed
Project has been completed and closed
๐Scope of Work
Complete site development for new multi-building phased campus; including private drives, accessible routes, and related utilities. Note: building-specific sidewalks and parking shall be submitted as each applicable phase is registered.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$303.0M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Replace 40-gallon Gas Water Heater Located: in laundry room closet
New Facilities Building for MECH5
Tunnel approximately 37 under foundation of home to access and replace all existing drain lines and reroute drain lines from beneath the home into the yard to connect to existing sewer line.
Replacement of an existing water heater Replace 40-gallon electric water heater Located in hallway closet
ePlan Review: Increase Occupant Load in 1st Floor Conference Room and 4th Floor Conference Room for Building 1