Project intelligenceTDLR TABS2020003481New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Larry Kiesling Youth Sports Complex

100 Bellaire Blvd, Kenedy, TX, 78119

Construction complete · Sep 2022Inspection Complete

Larry Kiesling Youth Sports Complex is a new construction project at 100 Bellaire Blvd, Kenedy, in Karnes County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2022). The project has an estimated value of $6.5M across about 616,630 sq ft.

Estimated project value
$6.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
616,630 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$11/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 30, 20191,096 days across supplied datesSep 30, 2022

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    1,078 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Larry Kiesling Youth Sports Complex

The Larry Kiesling Youth Sports Complex in Kenedy, Texas, is a completed new construction project valued at $6,500,000. Located at 100 Bellaire Blvd in Karnes County, the facility includes four new playing fields, two concession stands, a restroom facility, spectator seating, and upgraded utility infrastructure. The project passed its final TDLR accessibility inspection in September 2022, confirming that construction is complete.

Hanson Professional Services served as the design firm of record for this development. The estimated cost of $6,500,000 places the project above the median estimated cost for new construction filings in Karnes County, which stands at $1,400,000. While the total investment is significant, the cost per square foot is $11, well below the county median of $271. This disparity reflects the expansive nature of the site, which covers 616,630 sq ft.

Construction Timeline and Location

Construction began in September 2019, shortly after the project was registered with TDLR in October 2019. The filing indicated a completion date of September 2022, a timeline that spanned approximately 1,096 days. This duration is longer than the median scheduled build window of 242 days for similar projects in the county.

The complex is developed on public land by the City of Kenedy, with James Sutton listed as the Mayor. Funding sources include public funds, ensuring the facility serves as a community asset. Nearby businesses include H-E-B Fuel, McDonald's, Dollar General, and The Lodge At Kenedy, placing the sports complex within a commercial corridor that supports local traffic and tourism.

According to U.S. Census ACS 2023 five-year estimates, the ZIP code 78119 has a population of about 7,023 residents. The median household income in this area is $45,694, and the median owner-occupied home value is $128,500. The housing stock is primarily owner-occupied, with 2,375 housing units recorded. This demographic context highlights the importance of local recreational facilities for a community of this size and economic profile.

Hanson Professional Services has been involved in six other TDLR-registered projects totaling $3,550,000, including the Arroyo Colorado Kayak Launch in Harlingen and the Bejerano McFarland Trail in Laguna Heights. Their portfolio demonstrates a focus on public infrastructure and recreational development across South Texas. The Larry Kiesling Youth Sports Complex stands as a substantial addition to Kenedy's civic landscape, providing dedicated spaces for baseball and softball activities.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78119 (Kenedy)

One email per change. Unsubscribe in one click. Privacy.

Larry Kiesling Youth Sports Complex is a New Construction project located at 100 Bellaire Blvd, Kenedy, TX 78119 in Kenedy, Texas. The project has an estimated value of $6.5M covering 616,630 sq ft. Ciry of Kenedy, James Sutton, Mayor is the property owner and Hanson Professional Services is the design firm of record. The project was registered with TDLR on October 18, 2019.

Frequently Asked Questions

Is the Larry Kiesling Youth Sports Complex open?

The TDLR record shows the project passed its final TDLR accessibility inspection in September 2022, indicating construction is complete. Third-party listings on playncs.com reference upcoming events at the complex, suggesting it is active for use.

Who designed the sports complex?

Hanson Professional Services is the design firm of record for the Larry Kiesling Youth Sports Complex. They are also credited with other public projects in South Texas, such as the Arroyo Colorado Kayak Launch.

How much did construction cost?

The estimated cost for the new construction was $6,500,000. This amount is above the median estimated cost of $1,400,000 for new construction filings in Karnes County.

What facilities are included in the complex?

The complex features four new playing fields, two concession stands, one restroom facility, spectator seating, new parking, and utility infrastructure upgrades. It is located at 100 Bellaire Blvd in Kenedy.

When was the project completed?

Construction started in September 2019 and the project passed its final TDLR accessibility inspection in September 2022. The TDLR status is listed as Inspection Complete.

What is Larry Kiesling Youth Sports Complex?

Larry Kiesling Youth Sports Complex is a new construction project at 100 Bellaire Blvd in Kenedy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The construction of a new baseball/softball sports complex, with new parking, 4 new playing fields, 2 concession stands, 1 restroom facility, spectator seating, and utility infrastructure upgrades.

Is Larry Kiesling Youth Sports Complex open in Kenedy?

Construction on Larry Kiesling Youth Sports Complex is complete — TDLR records show the project passed its required accessibility inspection in Sep 2022. The building is finished and very likely open.

Where is Larry Kiesling Youth Sports Complex located?

Larry Kiesling Youth Sports Complex is located at 100 Bellaire Blvd, Kenedy, TX, 78119, in Karnes County.

Who is the owner or developer of Larry Kiesling Youth Sports Complex?

Ciry of Kenedy, James Sutton, Mayor is the property owner/developer of record for Larry Kiesling Youth Sports Complex, per its TDLR project registration.

Who is the architect or design firm for Larry Kiesling Youth Sports Complex?

Hanson Professional Services is the design firm of record for Larry Kiesling Youth Sports Complex, according to its TDLR filing.

How much does Larry Kiesling Youth Sports Complex cost and how big is it?

Larry Kiesling Youth Sports Complex has an estimated construction value of $6.5M and approximately 616,630 square feet (about $11/sqft), based on its TDLR filing.

Scope of Work

The construction of a new baseball/softball sports complex, with new parking, 4 new playing fields, 2 concession stands, 1 restroom facility, spectator seating, and utility infrastructure upgrades.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

100 Bellaire Blvd, Kenedy, TX, 78119

28.81374, -97.85887