Project intelligenceTDLR TABS2020003717Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sweeny Junior High School Renovations

800 N. Elm Street, Sweeny, TX, 77480

Construction complete · Aug 2020Project Closed

Sweeny Junior High School Renovations is a renovation/alteration project at 800 N. Elm Street, Sweeny, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $6.2M across about 128,000 sq ft.

Estimated project value
$6.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
128,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$48/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 22, 2019286 days across supplied datesAug 3, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    132 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77480 (Sweeny)

One email per change. Unsubscribe in one click. Privacy.

Sweeny Junior High School Renovations is a Renovation/Alteration project located at 800 N. Elm Street, Sweeny, TX 77480 in Sweeny, Texas. The project has an estimated value of $6.2M covering 128,000 sq ft. Sweeny Independent School District is the property owner and Stantec Architecture Inc is the design firm of record. The project was registered with TDLR on October 22, 2019.

Frequently Asked Questions

What is Sweeny Junior High School Renovations?

Sweeny Junior High School Renovations is a renovation/alteration project at 800 N. Elm Street in Sweeny, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: MEPT work: Outside air unit/fire sprinkler system installation. Plumbing systems/fixtures,electrical system, light fixture, fire alarm system, ceiling & grid replacement. Architectural work: Carpet replacement and painting.

Is Sweeny Junior High School Renovations open in Sweeny?

Construction on Sweeny Junior High School Renovations is complete — TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.

Where is Sweeny Junior High School Renovations located?

Sweeny Junior High School Renovations is located at 800 N. Elm Street, Sweeny, TX, 77480, in Brazoria County.

Who is the owner or developer of Sweeny Junior High School Renovations?

Sweeny Independent School District is the property owner/developer of record for Sweeny Junior High School Renovations, per its TDLR project registration.

Who is the architect or design firm for Sweeny Junior High School Renovations?

Stantec Architecture Inc is the design firm of record for Sweeny Junior High School Renovations, according to its TDLR filing.

How much does Sweeny Junior High School Renovations cost and how big is it?

Sweeny Junior High School Renovations has an estimated construction value of $6.2M and approximately 128,000 square feet (about $48/sqft), based on its TDLR filing.

Scope of Work

MEPT work: Outside air unit/fire sprinkler system installation. Plumbing systems/fixtures,electrical system, light fixture, fire alarm system, ceiling & grid replacement. Architectural work: Carpet replacement and painting.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

800 N. Elm Street, Sweeny, TX, 77480

Location by street address

Watch all construction in 77480 (Sweeny)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.