Suite 1000
Suite 1000 is a renovation/alteration project at 823 Congress Ave, Suite 1000, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2020). The project has an estimated value of $61K across about 734 sq ft.
๐Project Metrics
TDLR #TABS2020005230Project Closed
Project has been completed and closed
Suite 1000 is a Renovation/Alteration project located at 823 Congress Ave, Suite 1000, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $61K covering 734 sq ft. Brickman is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on November 12, 2019.
โFrequently Asked Questions
What is Suite 1000?
Suite 1000 is a renovation/alteration project at 823 Congress Ave, Suite 1000 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing office space for new tenant.
Is Suite 1000 open in Austin?
Construction on Suite 1000 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2020. The building is finished and very likely open.
Where is Suite 1000 located?
Suite 1000 is located at 823 Congress Ave, Suite 1000, Austin, TX, 78701, in Travis County.
Who is the owner or developer of Suite 1000?
Brickman is the property owner/developer of record for Suite 1000, per its TDLR project registration.
Who is the architect or design firm for Suite 1000?
S. Tipton Studio is the design firm of record for Suite 1000, according to its TDLR filing.
How much does Suite 1000 cost and how big is it?
Suite 1000 has an estimated construction value of $61K and approximately 734 square feet (about $83/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing office space for new tenant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 12, 2019
Review Complete
Inspection Complete
Closed
Jul 27, 2020
๐Related Projects
๐คSame Owner
$7.7M total๐๏ธSame Design Firm
$164.9M total๐Related City Permits
Building permits found at or near this location
Construct new driveway approach of 30 FT. No sidewalk inspection per plan review. SP-2025-0031C.SH.P1 2026 054621 000 00 SSI
ePlan: Commerical Expedited Review- New Construction 4 story Multi Family Building. (92004 SF).
Tunnel 30 FT under home to make repairs on sewer system.
Install stone and mortar retaining walls. Max height 7 feet
installation of the Fireline REF: 2025-131017 BP