Funding type
This project is privately funded, on private land for private use.
Lively Tract Phase 2
Lively Ranch Road, Leander, TX, 78628
Lively Tract Phase 2 is a new construction project at Lively Ranch Road, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2020). The project has an estimated value of $83K across about 13,347 sq ft.
- Estimated project value
- $83K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 13,347 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $6/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
17 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
304 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78628 (Leander)
One email per change. Unsubscribe in one click. Privacy.
Lively Tract Phase 2 is a New Construction project located at Lively Ranch Road, Leander, TX 78628 in Leander, Texas. The project has an estimated value of $83K covering 13,347 sq ft. Hwy 29 Ventures 2015 LP is the property owner and Pape-Dawson Engineers is the design firm of record. The project was registered with TDLR on November 14, 2019.
Frequently Asked Questions
What is Lively Tract Phase 2?
Lively Tract Phase 2 is a new construction project at Lively Ranch Road in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Streets, sidewalks, curb ramps for a single-family residential subdivision.
Is Lively Tract Phase 2 open in Leander?
Construction on Lively Tract Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2020. The building is finished and very likely open.
Where is Lively Tract Phase 2 located?
Lively Tract Phase 2 is located at Lively Ranch Road, Leander, TX, 78628, in Williamson County.
Who is the owner or developer of Lively Tract Phase 2?
Hwy 29 Ventures 2015 LP is the property owner/developer of record for Lively Tract Phase 2, per its TDLR project registration.
Who is the architect or design firm for Lively Tract Phase 2?
Pape-Dawson Engineers is the design firm of record for Lively Tract Phase 2, according to its TDLR filing.
How much does Lively Tract Phase 2 cost and how big is it?
Lively Tract Phase 2 has an estimated construction value of $83K and approximately 13,347 square feet (about $6/sqft), based on its TDLR filing.
Scope of Work
Streets, sidewalks, curb ramps for a single-family residential subdivision.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Related Projects
Same Owner
$2.1M totalWatch all construction in 78628 (Leander)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.