Project intelligenceTDLR TABS2020005408New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Mathis High School Additions and Renovations Bond 2018

1615 E. San Patricio Ave. 1615 E. San Patricio Ave., Mathis, TX, 78368

Construction complete · Mar 2022Project Closed

Mathis High School Additions and Renovations Bond 2018 is a new construction project at 1615 E. San Patricio Ave. 1615 E. San Patricio Ave., Mathis, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2022). The project has an estimated value of $10.2M across about 34,000 sq ft.

Estimated project value
$10.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
34,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$300/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 14, 2019868 days across supplied datesMar 31, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    62 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    806 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78368 (Mathis)

One email per change. Unsubscribe in one click. Privacy.

Mathis High School Additions and Renovations Bond 2018 is a New Construction project located at 1615 E. San Patricio Ave. 1615 E. San Patricio Ave., Mathis, TX 78368 in Mathis, Texas. The project has an estimated value of $10.2M covering 34,000 sq ft. Mathis Independent School District is the property owner and Gignac Architects is the design firm of record. The project was registered with TDLR on November 14, 2019.

Frequently Asked Questions

What is Mathis High School Additions and Renovations Bond 2018?

Mathis High School Additions and Renovations Bond 2018 is a new construction project at 1615 E. San Patricio Ave. 1615 E. San Patricio Ave. in Mathis, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1. General Construction of a 34,000 S.F. addition to the existing Mathis High School, Walkway canopy, Site Improvements, and Window Replacement with Interior Improvements to existing building and existing entry canopy.

Is Mathis High School Additions and Renovations Bond 2018 open in Mathis?

Construction on Mathis High School Additions and Renovations Bond 2018 is complete — TDLR records show the project passed its required accessibility inspection in Mar 2022. The building is finished and very likely open.

Where is Mathis High School Additions and Renovations Bond 2018 located?

Mathis High School Additions and Renovations Bond 2018 is located at 1615 E. San Patricio Ave. 1615 E. San Patricio Ave., Mathis, TX, 78368, in San Patricio County.

Who is the owner or developer of Mathis High School Additions and Renovations Bond 2018?

Mathis Independent School District is the property owner/developer of record for Mathis High School Additions and Renovations Bond 2018, per its TDLR project registration.

Who is the architect or design firm for Mathis High School Additions and Renovations Bond 2018?

Gignac Architects is the design firm of record for Mathis High School Additions and Renovations Bond 2018, according to its TDLR filing.

How much does Mathis High School Additions and Renovations Bond 2018 cost and how big is it?

Mathis High School Additions and Renovations Bond 2018 has an estimated construction value of $10.2M and approximately 34,000 square feet (about $300/sqft), based on its TDLR filing.

Scope of Work

1. General Construction of a 34,000 S.F. addition to the existing Mathis High School, Walkway canopy, Site Improvements, and Window Replacement with Interior Improvements to existing building and existing entry canopy.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1615 E. San Patricio Ave. 1615 E. San Patricio Ave., Mathis, TX 78368

28.08401, -97.81304

Watch all construction in 78368 (Mathis)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for San Patricio

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists