Project intelligenceTDLR TABS2020005596Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Elevator and Escalator Modernization

650 Griffin Street, Dallas, TX, 75202

Target date passed (May 2023)Review Complete

Elevator and Escalator Modernization is a renovation/alteration project at 650 Griffin Street, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.6M across about 4,000 sq ft.

Estimated project value
$2.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$650/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 18, 20191,260 days across supplied datesMay 1, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,106 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75202 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Elevator and Escalator Modernization is a Renovation/Alteration project located at 650 Griffin Street, Dallas, TX 75202 in Dallas, Texas. The project has an estimated value of $2.6M covering 4,000 sq ft. Raymond Sottilare, KBHCCD Facility Manager is the property owner and AECOM is the design firm of record. The project was registered with TDLR on November 18, 2019.

Frequently Asked Questions

What is Elevator and Escalator Modernization?

Elevator and Escalator Modernization is a renovation/alteration project at 650 Griffin Street in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Modernization of existing elevators and escalators. Removal of 2 escalators. Enclosure of one existing elevator machine room.

Is Elevator and Escalator Modernization open in Dallas?

Elevator and Escalator Modernization was scheduled to finish construction in May 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Elevator and Escalator Modernization located?

Elevator and Escalator Modernization is located at 650 Griffin Street, Dallas, TX, 75202, in Dallas County.

Who is the owner or developer of Elevator and Escalator Modernization?

Raymond Sottilare, KBHCCD Facility Manager is the property owner/developer of record for Elevator and Escalator Modernization, per its TDLR project registration.

Who is the architect or design firm for Elevator and Escalator Modernization?

AECOM is the design firm of record for Elevator and Escalator Modernization, according to its TDLR filing.

How much does Elevator and Escalator Modernization cost and how big is it?

Elevator and Escalator Modernization has an estimated construction value of $2.6M and approximately 4,000 square feet (about $650/sqft), based on its TDLR filing.

Scope of Work

Modernization of existing elevators and escalators. Removal of 2 escalators. Enclosure of one existing elevator machine room.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 75202 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Dallas

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists