Project intelligenceTDLR TABS2020006177New Construction
Funding type

This project is privately funded, on private land for private use.

Laney Directional Drilling Headquarters Build Out in Waller, TX

1100 Alegacy Place, Waller, TX, 77484

Construction complete · Feb 2020Project Closed

Laney Directional Drilling Headquarters Build Out is a new construction project at 1100 Alegacy Place, Waller, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2020). The project has an estimated value of $360K across about 23,700 sq ft.

Estimated project value
$360K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
23,700 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$15/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 25, 201992 days across supplied datesFeb 25, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77484 (Waller)

One email per change. Unsubscribe in one click. Privacy.

Laney Directional Drilling Headquarters Build Out is a New Construction project located at 1100 Alegacy Place, Waller, TX 77484 in Waller, Texas. The project has an estimated value of $360K covering 23,700 sq ft. Alegacy Development, LP is the property owner and Dev-Tex Engineering, LP is the design firm of record. The project was registered with TDLR on November 25, 2019.

Frequently Asked Questions

What is Laney Directional Drilling Headquarters Build Out?

Laney Directional Drilling Headquarters Build Out is a new construction project at 1100 Alegacy Place in Waller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Build Out

Is Laney Directional Drilling Headquarters Build Out open in Waller?

Construction on Laney Directional Drilling Headquarters Build Out is complete — TDLR records show the project passed its required accessibility inspection in Feb 2020. The building is finished and very likely open.

Where is Laney Directional Drilling Headquarters Build Out located?

Laney Directional Drilling Headquarters Build Out is located at 1100 Alegacy Place, Waller, TX, 77484, in Harris County.

Who is the owner or developer of Laney Directional Drilling Headquarters Build Out?

Alegacy Development, LP is the property owner/developer of record for Laney Directional Drilling Headquarters Build Out, per its TDLR project registration.

Who is the architect or design firm for Laney Directional Drilling Headquarters Build Out?

Dev-Tex Engineering, LP is the design firm of record for Laney Directional Drilling Headquarters Build Out, according to its TDLR filing.

How much does Laney Directional Drilling Headquarters Build Out cost and how big is it?

Laney Directional Drilling Headquarters Build Out has an estimated construction value of $360K and approximately 23,700 square feet (about $15/sqft), based on its TDLR filing.

Scope of Work

Interior Build Out

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1100 Alegacy Place, Waller, TX, 77484

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77484 (Waller)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.