4th Floor Restrooms
4th Floor Restrooms is a renovation/alteration project at 433 E. Las Colinas Blvd. 4th Floor, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $88K across about 457 sq ft.
๐Project Metrics
TDLR #TABS2020006542Project Registered
Project has been registered with TDLR and is in pre-construction phase
4th Floor Restrooms is a Renovation/Alteration project located at 433 E. Las Colinas Blvd. 4th Floor, Irving, TX 75039 in Irving, Texas. The project has an estimated value of $88K covering 457 sq ft. CBRE is the property owner and Entos is the design firm of record. The project was registered with TDLR on December 3, 2019.
โFrequently Asked Questions
What is 4th Floor Restrooms?
4th Floor Restrooms is a renovation/alteration project at 433 E. Las Colinas Blvd. 4th Floor in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Restrooms on 4th floor
Is 4th Floor Restrooms open in Irving?
4th Floor Restrooms is currently under construction in Irving, TX. Its current TDLR status is "Project Registered".
Where is 4th Floor Restrooms located?
4th Floor Restrooms is located at 433 E. Las Colinas Blvd. 4th Floor, Irving, TX, 75039, in Dallas County.
Who is the owner or developer of 4th Floor Restrooms?
CBRE is the property owner/developer of record for 4th Floor Restrooms, per its TDLR project registration.
Who is the architect or design firm for 4th Floor Restrooms?
Entos is the design firm of record for 4th Floor Restrooms, according to its TDLR filing.
How much does 4th Floor Restrooms cost and how big is it?
4th Floor Restrooms has an estimated construction value of $88K and approximately 457 square feet (about $192/sqft), based on its TDLR filing.
๐Scope of Work
Restrooms on 4th floor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 3, 2019
Review Complete
Inspection Complete
Closed