Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS
5409 PONCIANA DRIVE, Austin, TX, 78744
HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS is a renovation/alteration project at 5409 PONCIANA DRIVE, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $852K across about 81,206 sq ft.
- Estimated project value
- $852K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 81,206 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $10/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
175 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
70 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78744 (Austin)
One email per change. Unsubscribe in one click. Privacy.
HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS is a Renovation/Alteration project located at 5409 PONCIANA DRIVE,, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $852K covering 81,206 sq ft. AUSTIN INDEPENDENT SCHOOL DISTRICT is the property owner and SMITH & COMPANY ARCHITECTS is the design firm of record. The project was registered with TDLR on December 6, 2019.
Frequently Asked Questions
What is HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS?
HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS is a renovation/alteration project at 5409 PONCIANA DRIVE in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project scope includes repairs to a portion of the sidewalk that slopes back to the building in the corner near the existing downspout, review soil erosion around the site and ways to mitigate the problem, and upgrades to existing HV…
Is HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS open in Austin?
Construction on HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS is complete — TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.
Where is HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS located?
HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS is located at 5409 PONCIANA DRIVE, Austin, TX, 78744, in Travis County.
Who is the owner or developer of HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS?
AUSTIN INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS, per its TDLR project registration.
Who is the architect or design firm for HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS?
SMITH & COMPANY ARCHITECTS is the design firm of record for HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS, according to its TDLR filing.
How much does HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS cost and how big is it?
HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS has an estimated construction value of $852K and approximately 81,206 square feet (about $10/sqft), based on its TDLR filing.
Scope of Work
The project scope includes repairs to a portion of the sidewalk that slopes back to the building in the corner near the existing downspout, review soil erosion around the site and ways to mitigate the problem, and upgrades to existing HVAC and Elect.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5409 PONCIANA DRIVE, Austin, TX, 78744
Related Projects
Same Owner
$2.13B totalRelated City Permits
Building permits found at or near this location
Replacement of an existing water heater Swap from tank to tankless water heater Per Resident: Existing tankless to tankless swapped
New Mobile Home. ETJ. Private Property.
5409 Blue Bird Lane Bldg. 1. New 2-story 3 bedroom 3 bathroom dwelling unit with attached garage covered front porch and rear covered patio.
Replace existing residential water yard line from the existing water meter to the house. Existing City meter and tap to remain.
Demolition of a building at Josephine Houston Elementary School approximately 78525 square feet originally constructed circa 1977. SP-2024-0112CX -Approved
Watch all construction in 78744 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.