HOUSTON ELEMENTARY SCHOOL IMPROVEMENTS
๐Project Metrics
TDLR #TABS2020006904Project Closed
Project has been completed and closed
๐Scope of Work
The project scope includes repairs to a portion of the sidewalk that slopes back to the building in the corner near the existing downspout, review soil erosion around the site and ways to mitigate the problem, and upgrades to existing HVAC and Elect.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.3M total๐Related City Permits
Building permits found at or near this location
Replace burnt meter lug & wire for unit 1 only
repair existing electric circuits to existing duplex.
Repair burnt meter can to residence
Replace burned meter blocks and meter can to exsting duplex only
Install 100a service for TMO Small Cell Network (AU1061BA_51LAB)on AE steel pole. SCP #2019-0152905-000-00
๐Related Site Plans
City of Austin site plan approvals at this location