Project intelligenceTDLR TABS2020008780New Construction
Funding type

This project is privately funded, on private land for private use.

Mustang Creek Phase 2

4751 FM 1660, Hutto, TX, 78634

Target date passed (Dec 2020)Review Complete

Mustang Creek Phase 2 is a new construction project at 4751 FM 1660, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $50K across about 1,915 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,915 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$26/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 8, 2020358 days across supplied datesDec 31, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    114 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    244 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78634 (Hutto)

One email per change. Unsubscribe in one click. Privacy.

Mustang Creek Phase 2 is a New Construction project located at 4751 FM 1660, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $50K covering 1,915 sq ft. Continental Homes of Texas, L.P. is the property owner and Pape-Dawson Engineers is the design firm of record. The project was registered with TDLR on January 8, 2020.

Frequently Asked Questions

What is Mustang Creek Phase 2?

Mustang Creek Phase 2 is a new construction project at 4751 FM 1660 in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Street, sidewalk and curb ramps for 65 lot single family subdivision.

Is Mustang Creek Phase 2 open in Hutto?

Mustang Creek Phase 2 was scheduled to finish construction in Dec 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Mustang Creek Phase 2 located?

Mustang Creek Phase 2 is located at 4751 FM 1660, Hutto, TX, 78634, in Williamson County.

Who is the owner or developer of Mustang Creek Phase 2?

Continental Homes of Texas, L.P. is the property owner/developer of record for Mustang Creek Phase 2, per its TDLR project registration.

Who is the architect or design firm for Mustang Creek Phase 2?

Pape-Dawson Engineers is the design firm of record for Mustang Creek Phase 2, according to its TDLR filing.

How much does Mustang Creek Phase 2 cost and how big is it?

Mustang Creek Phase 2 has an estimated construction value of $50K and approximately 1,915 square feet (about $26/sqft), based on its TDLR filing.

Scope of Work

Street, sidewalk and curb ramps for 65 lot single family subdivision.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Related City Permits

Building permits found at or near this location

4751 E PARMER LN

New irrigation system for gas station

ExpiredPlumbing PermitIrrigationOct 2025
View Details
2025-137430 PP
4751 E PARMER LN

New Construction in the ETJ REF Site plan: SP-2021-0034D

FinalElectrical PermitNewJun 2025
View Details
2025-067269 EP
Pruneda Construction Company
4751 E PARMER LN

Plumbing Service for a new Convenience Store within the ETJ (7620 sq ft) 2021 021801D SP

FinalPlumbing PermitNewMay 2025
View Details
2025-060837 PP
Pruneda Construction LLC
4751 CAT MOUNTAIN DR

New pool and spa

FinalPlumbing PermitNewAug 2023
View Details
2021-135451 PP
4-A Plumber
4751 CAT MOUNTAIN DR

new irrigation

FinalPlumbing PermitIrrigationAug 2023
View Details
2023-097428 PP

Watch all construction in 78634 (Hutto)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists