Eastside Church of Christ
Eastside Church of Christ is a renovation/alteration project at 122 S. Ash, Kermit, in Winkler County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2020). The project has an estimated value of $1.5M across about 10,000 sq ft.
๐Project Metrics
TDLR #TABS2020009354Project Closed
Project has been completed and closed
Eastside Church of Christ is a Renovation/Alteration project located at 122 S. Ash, Kermit, TX 79745 in Kermit, Texas. The project has an estimated value of $1.5M covering 10,000 sq ft. Eastside Church of Christ is the property owner and Aeslin Design Group is the design firm of record. The project was registered with TDLR on January 16, 2020.
โFrequently Asked Questions
What is Eastside Church of Christ?
Eastside Church of Christ is a renovation/alteration project at 122 S. Ash in Kermit, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rebuild/new building on existing conc slab of previous building destroyed by fire (total loss) use existing parking, new metal building
Is Eastside Church of Christ open in Kermit?
Construction on Eastside Church of Christ is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2020. The building is finished and very likely open.
Where is Eastside Church of Christ located?
Eastside Church of Christ is located at 122 S. Ash, Kermit, TX, 79745, in Winkler County.
Who is the owner or developer of Eastside Church of Christ?
Eastside Church of Christ is the property owner/developer of record for Eastside Church of Christ, per its TDLR project registration.
Who is the architect or design firm for Eastside Church of Christ?
Aeslin Design Group is the design firm of record for Eastside Church of Christ, according to its TDLR filing.
How much does Eastside Church of Christ cost and how big is it?
Eastside Church of Christ has an estimated construction value of $1.5M and approximately 10,000 square feet (about $150/sqft), based on its TDLR filing.
๐Scope of Work
Rebuild/new building on existing conc slab of previous building destroyed by fire (total loss) use existing parking, new metal building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 16, 2020
Review Complete
Inspection Complete
Closed
Dec 28, 2020