Project intelligenceTDLR TABS2020010218New Construction
Funding type

This project is privately funded, on private land for private use.

Dulce Vista

2601 Interstate 45, New Waverly, TX, 77358

Target date passed (Jun 2020)Review Complete

Dulce Vista is a new construction project at 2601 Interstate 45, New Waverly, in Walker County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.2M across about 9,050 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,050 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$133/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 22, 2019237 days across supplied datesJun 15, 2020

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    99 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    138 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77358 (New Waverly)

One email per change. Unsubscribe in one click. Privacy.

Dulce Vista is a New Construction project located at 2601 Interstate 45, New Waverly, TX 77358 in New Waverly, Texas. The project has an estimated value of $1.2M covering 9,050 sq ft. Dulce Vista Homes is the property owner and Bleyl Engineering is the design firm of record. The project was registered with TDLR on January 29, 2020.

Frequently Asked Questions

What is Dulce Vista?

Dulce Vista is a new construction project at 2601 Interstate 45 in New Waverly, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a 9050 square foot building, parking, and detention.

Is Dulce Vista open in New Waverly?

Dulce Vista was scheduled to finish construction in Jun 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Dulce Vista located?

Dulce Vista is located at 2601 Interstate 45, New Waverly, TX, 77358, in Walker County.

Who is the owner or developer of Dulce Vista?

Dulce Vista Homes is the property owner/developer of record for Dulce Vista, per its TDLR project registration.

Who is the architect or design firm for Dulce Vista?

Bleyl Engineering is the design firm of record for Dulce Vista, according to its TDLR filing.

How much does Dulce Vista cost and how big is it?

Dulce Vista has an estimated construction value of $1.2M and approximately 9,050 square feet (about $133/sqft), based on its TDLR filing.

Scope of Work

Construction of a 9050 square foot building, parking, and detention.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 77358 (New Waverly)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Walker

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists