Project intelligenceTDLR TABS2020010811Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2019 Additions and Renovations to Silverton ISD - Phase 2

700 Loretta St, Silverton, TX, 79257

Construction complete · May 2021Project Closed

2019 Additions and Renovations to Silverton ISD - Phase 2 is a additions to existing building project at 700 Loretta St, Silverton, in Briscoe County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2021). The project has an estimated value of $4.2M across about 9,180 sq ft.

Estimated project value
$4.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,180 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$453/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 5, 2020478 days across supplied datesMay 28, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    452 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79257 (Silverton)

One email per change. Unsubscribe in one click. Privacy.

2019 Additions and Renovations to Silverton ISD - Phase 2 is a Additions to Existing Building project located at 700 Loretta St, Silverton, TX 79257 in Silverton, Texas. The project has an estimated value of $4.2M covering 9,180 sq ft. Silverton ISD is the property owner and Hohe Design Group is the design firm of record. The project was registered with TDLR on February 5, 2020.

Frequently Asked Questions

What is 2019 Additions and Renovations to Silverton ISD - Phase 2?

2019 Additions and Renovations to Silverton ISD - Phase 2 is a additions to existing building project at 700 Loretta St in Silverton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Commons area to existing gymnasium, new locker rooms, new classrooms and hallways in between existing buildings. Minor aesthetic renovations to existing gymnasium and wood and metal shops. New football concession stand.

Is 2019 Additions and Renovations to Silverton ISD - Phase 2 open in Silverton?

Construction on 2019 Additions and Renovations to Silverton ISD - Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in May 2021. The building is finished and very likely open.

Where is 2019 Additions and Renovations to Silverton ISD - Phase 2 located?

2019 Additions and Renovations to Silverton ISD - Phase 2 is located at 700 Loretta St, Silverton, TX, 79257, in Briscoe County.

Who is the owner or developer of 2019 Additions and Renovations to Silverton ISD - Phase 2?

Silverton ISD is the property owner/developer of record for 2019 Additions and Renovations to Silverton ISD - Phase 2, per its TDLR project registration.

Who is the architect or design firm for 2019 Additions and Renovations to Silverton ISD - Phase 2?

Hohe Design Group is the design firm of record for 2019 Additions and Renovations to Silverton ISD - Phase 2, according to its TDLR filing.

How much does 2019 Additions and Renovations to Silverton ISD - Phase 2 cost and how big is it?

2019 Additions and Renovations to Silverton ISD - Phase 2 has an estimated construction value of $4.2M and approximately 9,180 square feet (about $453/sqft), based on its TDLR filing.

Scope of Work

New Commons area to existing gymnasium, new locker rooms, new classrooms and hallways in between existing buildings. Minor aesthetic renovations to existing gymnasium and wood and metal shops. New football concession stand.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

700 Loretta St, Silverton, TX, 79257

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79257 (Silverton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Silverton?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.