Terminal Apron Hangar Replacement Project in Sugar Land, TX

12888 B Highway 6 South, Sugar Land, TX, 77478

Target date passed (Dec 2022)Review Complete

Terminal Apron Hangar Replacement Project is a new construction project at 12888 B Highway 6 South, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $5.6M across about 40,000 sq ft.

Estimated project value
$5.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
40,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$140/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 6, 20201,029 days across supplied datesDec 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    116 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    913 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Terminal Apron Hangar Replacement Project

The Terminal Apron Hangar Replacement Project at Sugar Land Regional Airport involves the new construction of a 200-foot by 200-foot box hangar. This 40,000 square foot structure is located at 12888 B Highway 6 South in Sugar Land, Texas. The filing specifies the scope includes associated parking lot pavement. The estimated cost for this new construction is $5,587,999, which equates to $140 per square foot. TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Sugar Land Regional Airport is the owner and developer of record for this project. KSA Engineers Inc. serves as the design firm of record. The project involves public funds, public land, or is a Federally funded roadway project. Registration with TDLR occurred in February 2020, and plan review was completed in the same month. Construction was scheduled to start in June 2020 with a planned completion date of December 2022.

Project Scale and Context

This hangar project is significantly larger than typical new construction filings in Fort Bend County. The estimated cost is above the county median of $700,000 for its type. The size of 40,000 square feet exceeds the county median of 9,173 square feet. The cost per square foot of $140 is above the county median of $100. The scheduled build window of 913 days is longer than the county median of 201 days. KSA Engineers Inc. has six other TDLR-registered projects, including work at Hamilton Municipal Airport and Burnet Municipal Airport. Sugar Land Regional Airport has one other registered project, the US Customs & Border Protection Building, with an estimated cost of $250,000.

The surrounding area, ZIP code 77478, has a population of about 22,699 according to U.S. Census ACS 2023 five-year estimates. The median household income is $116,205, and the median owner-occupied home value is $378,700. Housing in this area is predominantly owner-occupied, with 9,168 housing units. The Fort Bend County unemployment rate was 5 percent in July 2026, higher than a year earlier. Other registered projects in the same area include Houston Methodist Sugar Land Hospital and Branford Medical Office Building B.

Third-party sources provide context on the airport's operations. A page on sugarlandtx.gov lists the airport as a key facility. GlobalSelect FBO describes the Sugar Land Regional Airport as an executive airport serving the greater Houston area. Wikipedia notes the airport's presence in Sugar Land. AirNav identifies the airport as KSGR in Houston, Texas. These sources describe the airport's role but do not confirm the specific status of this hangar construction.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77478 (Sugar Land)

One email per change. Unsubscribe in one click. Privacy.

Terminal Apron Hangar Replacement Project is a New Construction project located at 12888 B Highway 6 South, Sugar Land, TX 77478 in Sugar Land, Texas. The project has an estimated value of $5.6M covering 40,000 sq ft. Sugar Land Regional Airport is the property owner and KSA Engineers Inc. is the design firm of record. The project was registered with TDLR on February 6, 2020.

Frequently Asked Questions

Is the hangar construction finished?

TDLR has not yet recorded a final inspection for this project. The filing lists a completion date of December 2022, but the public record does not confirm the current state of the site.

Who is building the hangar?

Sugar Land Regional Airport is the owner and developer of record. KSA Engineers Inc. is the design firm of record for this new construction project.

How much does the hangar cost?

The estimated cost is $5,587,999. This breaks down to $140 per square foot for the 40,000 square foot structure.

Where is the project located?

The project is at 12888 B Highway 6 South, Sugar Land, TX 77478, in Fort Bend County.

What is the scope of work?

The scope includes the construction of a 200-foot by 200-foot box hangar and associated parking lot pavement.

What is Terminal Apron Hangar Replacement Project?

Terminal Apron Hangar Replacement Project is a new construction project at 12888 B Highway 6 South in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a 200' x 200' Box Hangar and associated parking lot pavement.

Is Terminal Apron Hangar Replacement Project open in Sugar Land?

Terminal Apron Hangar Replacement Project was scheduled to finish construction in Dec 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Terminal Apron Hangar Replacement Project located?

Terminal Apron Hangar Replacement Project is located at 12888 B Highway 6 South, Sugar Land, TX, 77478, in Fort Bend County.

Who is the owner or developer of Terminal Apron Hangar Replacement Project?

Sugar Land Regional Airport is the property owner/developer of record for Terminal Apron Hangar Replacement Project, per its TDLR project registration.

Who is the architect or design firm for Terminal Apron Hangar Replacement Project?

KSA Engineers Inc. is the design firm of record for Terminal Apron Hangar Replacement Project, according to its TDLR filing.

How much does Terminal Apron Hangar Replacement Project cost and how big is it?

Terminal Apron Hangar Replacement Project has an estimated construction value of $5.6M and approximately 40,000 square feet (about $140/sqft), based on its TDLR filing.

Scope of Work

Construction of a 200' x 200' Box Hangar and associated parking lot pavement.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12888 B Highway 6 South, Sugar Land, TX, 77478

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77478 (Sugar Land)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Sugar Land?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.