Project intelligenceTDLR TABS2020011068Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Energy Center II Lobby Repositioning in Houston, TX

575 N Dairy Ashford Rd, Houston, TX, 77079

Construction complete · Jul 2020Project Closed

Energy Center II Lobby Repositioning is a renovation/alteration project at 575 N Dairy Ashford Rd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2020). The project has an estimated value of $804K across about 4,750 sq ft.

Estimated project value
$804K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,750 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$169/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 10, 2020172 days across supplied datesJul 31, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    51 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    121 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77079 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Energy Center II Lobby Repositioning is a Renovation/Alteration project located at 575 N Dairy Ashford Rd, Houston, TX 77079 in Houston, Texas. The project has an estimated value of $804K covering 4,750 sq ft. CBRE is the property owner and Page Southerland Page, Inc. is the design firm of record. The project was registered with TDLR on February 10, 2020.

Frequently Asked Questions

What is Energy Center II Lobby Repositioning?

Energy Center II Lobby Repositioning is a renovation/alteration project at 575 N Dairy Ashford Rd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: lobby repositioning - removal of existing finishes, lighting, millwork & replacement with new, including lighting, storefront, flooring, ceiling, wall surfaces, security desk & millwork

Is Energy Center II Lobby Repositioning open in Houston?

Construction on Energy Center II Lobby Repositioning is complete — TDLR records show the project passed its required accessibility inspection in Jul 2020. The building is finished and very likely open.

Where is Energy Center II Lobby Repositioning located?

Energy Center II Lobby Repositioning is located at 575 N Dairy Ashford Rd, Houston, TX, 77079, in Harris County.

Who is the owner or developer of Energy Center II Lobby Repositioning?

CBRE is the property owner/developer of record for Energy Center II Lobby Repositioning, per its TDLR project registration.

Who is the architect or design firm for Energy Center II Lobby Repositioning?

Page Southerland Page, Inc. is the design firm of record for Energy Center II Lobby Repositioning, according to its TDLR filing.

How much does Energy Center II Lobby Repositioning cost and how big is it?

Energy Center II Lobby Repositioning has an estimated construction value of $804K and approximately 4,750 square feet (about $169/sqft), based on its TDLR filing.

Scope of Work

lobby repositioning - removal of existing finishes, lighting, millwork & replacement with new, including lighting, storefront, flooring, ceiling, wall surfaces, security desk & millwork

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

575 N Dairy Ashford Rd, Houston, TX, 77079

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

575 N DAIRY ASHFORD RD 525, Houston, TX 77079

3,898 SQ. FT REMODEL, OFFICE 1-13-1-B-B-SPK-FA 2021 IBC

IssuedBuilding PmtJun 2026
HOU-26039272-BUILDINGPMT
575 N DAIRY ASHFORD RD 410, Houston, TX 77079

5,150 SF HI-RISE OFFICE REMODEL 1-13-1-B-A 21 IBC 100% NFPA 13

IssuedBuilding PmtFeb 2026
HOU-26000749-BUILDINGPMT
575 N DAIRY ASHFORD RD, Houston, TX 77079

SITEWORK/SIDEWALK AND PATIO

IssuedBuilding PmtJan 2026
HOU-25077056-BUILDINGPMT
575 N DAIRY ASHFORD RD, Houston, TX 77079

OFFICE LOBBY REMODEL 1-13-1-B-A 2021 IBC

IssuedBuilding PmtJan 2026
HOU-25085324-BUILDINGPMT

Watch all construction in 77079 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.