Winkler County Airport Hangar Improvements

2750 South Farm-to-Market Road 1232, Wink, TX, 79745

Construction complete · Apr 2021Project Closed

Winkler County Airport Hangar Improvements is a new construction project at 2750 South Farm-to-Market Road 1232, Wink, in Winkler County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2021). The project has an estimated value of $1.5M across about 63,500 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
63,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$24/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 12, 2020443 days across supplied datesApr 30, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    79 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    364 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Winkler County Airport Hangar Improvements

Winkler County completed a $1,500,000 new construction project at Winkler County Airport in Wink, Texas. The work, filed as Winkler County Airport Hangar Improvements, involved the construction of eight new T-hangars and one attached box hangar, totaling 63,500 square feet of new facility space and pavement. The project is located at 2750 South Farm-to-Market Road 1232, Wink, TX 79745, within Winkler County. TDLR closed the project file in April 2021, which marks the end of the accessibility review process for this construction.

Scope and Design

The construction scope included the build-out of eight T-hangars, each measuring 51 feet by 189 feet, alongside a single box hangar measuring 75 feet by 75 feet. These structures represent approximately 15,300 square feet of hangar space. The project also included new hangar access taxiways, with the total pavement area estimated at 48,200 square feet. Parkhill, Smith & Cooper, Inc., with Bijan Jamalabad listed as the designer of record, provided the design services for this infrastructure upgrade. Stephen D Macphie served as the registered accessibility specialist for the filing.

The estimated cost of $1,500,000 translates to $24 per square foot. This figure is below the county median of $359 per square foot for new construction projects in Winkler County. The median estimated cost for similar filings in the area is $3,100,000, meaning this project’s budget is below that median. The scheduled build window was 364 days, which is close to the county median of 368 days for new construction. Winkler County is the owner of record, a public entity that has also registered two other projects in the state, including the Wink Public Library and County Offices and Winkler County Meals on Wheels in Kermit.

Timeline and Status

The project was registered with TDLR in February 2020. Construction began in May 2020, following the initial registration. The filing indicated a completion date of April 2021. Since that date has passed and the TDLR file was closed in April 2021, the regulatory review phase for this specific construction is complete. The project involved public funds and public land, consistent with its status as a county-owned airport facility. The low cost per square foot reflects the nature of the work, which focused heavily on pavement and large-span structures rather than high-finish interior finishes typical of commercial office spaces.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79745 (Wink)

One email per change. Unsubscribe in one click. Privacy.

Winkler County Airport Hangar Improvements is a New Construction project located at 2750 South Farm-to-Market Road 1232, Wink, TX 79745 in Wink, Texas. The project has an estimated value of $1.5M covering 63,500 sq ft. Winkler County is the property owner and Parkhill, Smith & Cooper, Inc. (Bijan Jamalabad) dg is the design firm of record. The project was registered with TDLR on February 12, 2020.

Frequently Asked Questions

Is the Winkler County Airport hangar project finished?

Yes. TDLR closed the project file in April 2021. The filing listed a completion date of April 2021, and the construction period ended at that time.

What is the total square footage of the new hangars?

The total project size is 63,500 square feet. This includes 15,300 square feet of hangar space and 48,200 square feet of new pavement and taxiways.

Who is the owner of the Winkler County Airport project?

Winkler County is the owner and developer of record. The project is located on public land at 2750 South Farm-to-Market Road 1232 in Wink, Texas.

How much did the hangar improvements cost?

The estimated cost was $1,500,000. This equates to $24 per square foot, which is below the county median of $359 per square foot for new construction.

Who designed the new airport hangars?

Parkhill, Smith & Cooper, Inc. was the design firm of record. Bijan Jamalabad is listed as the designer, and Stephen D Macphie was the registered accessibility specialist.

What is Winkler County Airport Hangar Improvements?

Winkler County Airport Hangar Improvements is a new construction project at 2750 South Farm-to-Market Road 1232 in Wink, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct a new set of eight-unit T-hangars (51'x189') with an attached Box hangar (75'x75') and new hangar access taxiways. Hangars estimated at 15,300 sf & Pavement at 48,200 sf.

Is Winkler County Airport Hangar Improvements open in Wink?

Construction on Winkler County Airport Hangar Improvements is complete — TDLR records show the project passed its required accessibility inspection in Apr 2021. The building is finished and very likely open.

Where is Winkler County Airport Hangar Improvements located?

Winkler County Airport Hangar Improvements is located at 2750 South Farm-to-Market Road 1232, Wink, TX, 79745, in Winkler County.

Who is the owner or developer of Winkler County Airport Hangar Improvements?

Winkler County is the property owner/developer of record for Winkler County Airport Hangar Improvements, per its TDLR project registration.

Who is the architect or design firm for Winkler County Airport Hangar Improvements?

Parkhill, Smith & Cooper, Inc. (Bijan Jamalabad) dg is the design firm of record for Winkler County Airport Hangar Improvements, according to its TDLR filing.

How much does Winkler County Airport Hangar Improvements cost and how big is it?

Winkler County Airport Hangar Improvements has an estimated construction value of $1.5M and approximately 63,500 square feet (about $24/sqft), based on its TDLR filing.

Scope of Work

Construct a new set of eight-unit T-hangars (51'x189') with an attached Box hangar (75'x75') and new hangar access taxiways. Hangars estimated at 15,300 sf & Pavement at 48,200 sf.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2750 South Farm-to-Market Road 1232, Wink, TX, 79745