Project intelligenceTDLR TABS2020012377Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Stratford High School Addition and Renovations - Phase 2 in Houston, TX

14555 Fern Drive, Houston, TX, 77079

Construction complete · Dec 2021Project Closed

Stratford High School Addition and Renovations - Phase 2 is a additions to existing building project at 14555 Fern Drive, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $37.0M across about 35,405 sq ft.

Estimated project value
$37.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
35,405 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.05K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 26, 2020674 days across supplied datesDec 31, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    126 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    548 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77079 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Stratford High School Addition and Renovations - Phase 2 is a Additions to Existing Building project located at 14555 Fern Drive, Houston, TX 77079 in Houston, Texas. The project has an estimated value of $37.0M covering 35,405 sq ft. Spring Branch IAS is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on February 26, 2020.

Frequently Asked Questions

What is Stratford High School Addition and Renovations - Phase 2?

Stratford High School Addition and Renovations - Phase 2 is a additions to existing building project at 14555 Fern Drive in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove Existing Auditorium and replacing with 1000 seat Auditorium. Interior renovations are removing existing lockers to convert the space into 2 classrooms, convert circulation areas into collaborative spaces, reroof and hvac upgrades.

Is Stratford High School Addition and Renovations - Phase 2 open in Houston?

Construction on Stratford High School Addition and Renovations - Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.

Where is Stratford High School Addition and Renovations - Phase 2 located?

Stratford High School Addition and Renovations - Phase 2 is located at 14555 Fern Drive, Houston, TX, 77079, in Harris County.

Who is the owner or developer of Stratford High School Addition and Renovations - Phase 2?

Spring Branch IAS is the property owner/developer of record for Stratford High School Addition and Renovations - Phase 2, per its TDLR project registration.

Who is the architect or design firm for Stratford High School Addition and Renovations - Phase 2?

PBK Architects is the design firm of record for Stratford High School Addition and Renovations - Phase 2, according to its TDLR filing.

How much does Stratford High School Addition and Renovations - Phase 2 cost and how big is it?

Stratford High School Addition and Renovations - Phase 2 has an estimated construction value of $37.0M and approximately 35,405 square feet (about $1.05K/sqft), based on its TDLR filing.

Scope of Work

Remove Existing Auditorium and replacing with 1000 seat Auditorium. Interior renovations are removing existing lockers to convert the space into 2 classrooms, convert circulation areas into collaborative spaces, reroof and hvac upgrades.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

14555 Fern Drive, Houston, TX, 77079

Location by street address

Watch all construction in 77079 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.