Project intelligenceTDLR TABS2020012784New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Irion County Fire Facility in Mertzon, TX

114 W Main AveMertzon, Mertzon, TX, 76941

Construction complete · Sep 2020Project Closed

Irion County Fire Facility is a new construction project at 114 W Main AveMertzon, Mertzon, in Irion County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2020). The project has an estimated value of $1.3M across about 7,000 sq ft.

Estimated project value
$1.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$186/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 3, 2020195 days across supplied datesSep 14, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    167 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76941 (Mertzon)

One email per change. Unsubscribe in one click. Privacy.

Irion County Fire Facility is a New Construction project located at 114 W Main AveMertzon, Mertzon, TX 76941 in Mertzon, Texas. The project has an estimated value of $1.3M covering 7,000 sq ft. Irion County, Judge Molly Criner is the property owner and WRA Architects, Inc. is the design firm of record. The project was registered with TDLR on March 3, 2020.

Frequently Asked Questions

What is Irion County Fire Facility?

Irion County Fire Facility is a new construction project at 114 W Main AveMertzon in Mertzon, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The proposed project is comprised of a new volunteer fire station. Spaces include (4) bays, a training / break room, office, and restroom.

Is Irion County Fire Facility open in Mertzon?

Construction on Irion County Fire Facility is complete — TDLR records show the project passed its required accessibility inspection in Sep 2020. The building is finished and very likely open.

Where is Irion County Fire Facility located?

Irion County Fire Facility is located at 114 W Main AveMertzon, Mertzon, TX, 76941, in Irion County.

Who is the owner or developer of Irion County Fire Facility?

Irion County, Judge Molly Criner is the property owner/developer of record for Irion County Fire Facility, per its TDLR project registration.

Who is the architect or design firm for Irion County Fire Facility?

WRA Architects, Inc. is the design firm of record for Irion County Fire Facility, according to its TDLR filing.

How much does Irion County Fire Facility cost and how big is it?

Irion County Fire Facility has an estimated construction value of $1.3M and approximately 7,000 square feet (about $186/sqft), based on its TDLR filing.

Scope of Work

The proposed project is comprised of a new volunteer fire station. Spaces include (4) bays, a training / break room, office, and restroom.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

114 W Main AveMertzon, Mertzon, TX, 76941

Loading location map…
31.25723, -100.81965

Watch all construction in 76941 (Mertzon)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.