Project intelligenceTDLR TABS2020013650New Construction
Funding type

This project is privately funded, on private land for private use.

PIONEER POINT, PHASE 1

5950 W. BAILEY BOSWELL ROAD, Fort Worth, TX, 76179

Construction complete · Mar 2020Project Closed

PIONEER POINT, PHASE 1 is a new construction project at 5950 W. BAILEY BOSWELL ROAD, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2020). The project has an estimated value of $183K across about 23,800 sq ft.

Estimated project value
$183K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
23,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 15, 202039 days across supplied datesMar 25, 2020

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    27 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    12 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About PIONEER POINT, PHASE 1

Pioneer Point, Phase 1, is a new construction project located at 5950 W. Bailey Boswell Road in Fort Worth, Texas. The TDLR registration records describe the scope as subdivision improvements, specifically the installation of water, sanitary sewer, drainage, and franchise utilities. The project encompasses 23,800 sq ft of work with an estimated cost of $182,700.

The owner of record is DR Horton, a national homebuilder, while the design firm of record is Peloton Land Solutions. Virginia E Cooke is listed as the registered accessibility specialist for this filing.

Construction Timeline and Status

According to the TDLR filing, construction was scheduled to begin in February 2020, with a completion date of March 2020. The scheduled build window of 39 days is shorter than the county median of 214 days for similar new construction filings. TDLR closed the project file in March 2020, which marks the end of the accessibility review process for this construction.

The estimated cost of $182,700 places this project below the county median for its type, which stands at $800,000. The cost per square foot is $8, significantly below the county median of $120. This efficiency reflects the infrastructure-focused nature of the work, which supports the development of residential lots rather than the construction of finished structures.

Local Context and Nearby Projects

DR Horton has six other TDLR-registered projects in the region, totaling $4,156,000, including Chapel Creek in Fort Worth and Bridgeview Phase 1 in Haslet. Peloton Land Solutions has three other registered projects, including Bentley Bridge Drive in Fort Worth, which had a much larger scope of $9,034,342. The site is located near Pioneer Point Park and The Table Community Church, contributing to the residential character of the area.

The surrounding ZIP code 76179 has a population of about 76,468 and a median household income of $108,428, according to U.S. Census estimates. The housing stock is predominantly owner-occupied, with a median home value of $299,300. This infrastructure project supports the continued growth of single-family homes in a well-established suburban community.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76179 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

PIONEER POINT, PHASE 1 is a New Construction project located at 5950 W. BAILEY BOSWELL ROAD, Fort Worth, TX 76179 in Fort Worth, Texas. The project has an estimated value of $183K covering 23,800 sq ft. DR HORTON is the property owner and PELOTON LAND SOLUTIONS is the design firm of record. The project was registered with TDLR on March 13, 2020.

Frequently Asked Questions

Is Pioneer Point Phase 1 finished?

TDLR closed the project file in March 2020, indicating the accessibility review process is complete. The filing lists a completion date of March 2020, and the construction window was 39 days.

Who owns the Pioneer Point project in Fort Worth?

DR Horton is the owner of record. Peloton Land Solutions is the design firm, and Virginia E Cooke is the registered accessibility specialist for the filing.

What work was done at 5950 W. Bailey Boswell Road?

The scope included subdivision improvements for water, sanitary sewer, drainage, and franchise utilities. It was a new construction project covering 23,800 sq ft.

How much did the Pioneer Point infrastructure cost?

The estimated cost was $182,700. This is below the Tarrant County median of $800,000 for similar new construction filings, with a cost per square foot of $8.

What is PIONEER POINT, PHASE 1?

PIONEER POINT, PHASE 1 is a new construction project at 5950 W. BAILEY BOSWELL ROAD in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: SUBDIVISION IMPROVEMENTS - WATER, SANITARY SEWER, DRAINAGE AND FRANCHISE UTILITIES.

Is PIONEER POINT, PHASE 1 open in Fort Worth?

Construction on PIONEER POINT, PHASE 1 is complete — TDLR records show the project passed its required accessibility inspection in Mar 2020. The building is finished and very likely open.

Where is PIONEER POINT, PHASE 1 located?

PIONEER POINT, PHASE 1 is located at 5950 W. BAILEY BOSWELL ROAD, Fort Worth, TX, 76179, in Tarrant County.

Who is the owner or developer of PIONEER POINT, PHASE 1?

DR HORTON is the property owner/developer of record for PIONEER POINT, PHASE 1, per its TDLR project registration.

Who is the architect or design firm for PIONEER POINT, PHASE 1?

PELOTON LAND SOLUTIONS is the design firm of record for PIONEER POINT, PHASE 1, according to its TDLR filing.

How much does PIONEER POINT, PHASE 1 cost and how big is it?

PIONEER POINT, PHASE 1 has an estimated construction value of $183K and approximately 23,800 square feet (about $8/sqft), based on its TDLR filing.

Scope of Work

SUBDIVISION IMPROVEMENTS - WATER, SANITARY SEWER, DRAINAGE AND FRANCHISE UTILITIES.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5950 W. BAILEY BOSWELL ROAD, Fort Worth, TX, 76179

Location by street address

Watch all construction in 76179 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.