Redeemer
Redeemer is a renovation/alteration project at 410 W. Abram, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $500K across about 7,590 sq ft.
๐Project Metrics
TDLR #TABS2020014596Review Complete
Design review complete, construction may proceed
Redeemer is a Renovation/Alteration project located at 410 W. Abram, Arlington, TX 76012 in Arlington, Texas. The project has an estimated value of $500K covering 7,590 sq ft. Happy King Trusts is the property owner and H2H Plans, LLC is the design firm of record. The project was registered with TDLR on March 30, 2020.
โFrequently Asked Questions
What is Redeemer?
Redeemer is a renovation/alteration project at 410 W. Abram in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior of remodel of an existing building, including electrical, plumbing and HVAC. Removal of teller boxes under existing porta cochere.
Is Redeemer open in Arlington?
Redeemer is currently under construction in Arlington, TX. Its current TDLR status is "Review Complete".
Where is Redeemer located?
Redeemer is located at 410 W. Abram, Arlington, TX, 76012, in Tarrant County.
Who is the owner or developer of Redeemer?
Happy King Trusts is the property owner/developer of record for Redeemer, per its TDLR project registration.
Who is the architect or design firm for Redeemer?
H2H Plans, LLC is the design firm of record for Redeemer, according to its TDLR filing.
How much does Redeemer cost and how big is it?
Redeemer has an estimated construction value of $500K and approximately 7,590 square feet (about $66/sqft), based on its TDLR filing.
๐Scope of Work
Interior of remodel of an existing building, including electrical, plumbing and HVAC. Removal of teller boxes under existing porta cochere.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 30, 2020
Review Complete
Mar 30, 2020
Inspection Complete
Closed