Project intelligenceTDLR TABS2020014700New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sidewalk Along Beltway 8 Northbound Frontage Rd. in Houston, TX

BW8 N From Wallisville Rd. to Auburn Knoll Ave, Houston, TX, 77049

Construction complete · Oct 2022Project Closed

Sidewalk Along Beltway 8 Northbound Frontage Rd. is a new construction project at BW8 N From Wallisville Rd. to Auburn Knoll Ave, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2022). The project has an estimated value of $44.5M across about 5,000 sq ft.

Estimated project value
$44.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8.89K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 31, 2020931 days across supplied datesOct 18, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    427 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    504 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77049 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Sidewalk Along Beltway 8 Northbound Frontage Rd. is a New Construction project located at BW8 N From Wallisville Rd. to Auburn Knoll Ave, Houston, TX 77049 in Houston, Texas. The project has an estimated value of $44.5M covering 5,000 sq ft. HARRIS COUNTY ENGINEERING DEPT is the property owner and Omega Engineers, Inc. is the design firm of record. The project was registered with TDLR on March 31, 2020.

Frequently Asked Questions

What is Sidewalk Along Beltway 8 Northbound Frontage Rd.?

Sidewalk Along Beltway 8 Northbound Frontage Rd. is a new construction project at BW8 N From Wallisville Rd. to Auburn Knoll Ave in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalks & ADA ramps, consisting of grading, base, Pavement and Landscaping

Is Sidewalk Along Beltway 8 Northbound Frontage Rd. open in Houston?

Construction on Sidewalk Along Beltway 8 Northbound Frontage Rd. is complete — TDLR records show the project passed its required accessibility inspection in Oct 2022. The building is finished and very likely open.

Where is Sidewalk Along Beltway 8 Northbound Frontage Rd. located?

Sidewalk Along Beltway 8 Northbound Frontage Rd. is located at BW8 N From Wallisville Rd. to Auburn Knoll Ave, Houston, TX, 77049, in Harris County.

Who is the owner or developer of Sidewalk Along Beltway 8 Northbound Frontage Rd.?

HARRIS COUNTY ENGINEERING DEPT is the property owner/developer of record for Sidewalk Along Beltway 8 Northbound Frontage Rd., per its TDLR project registration.

Who is the architect or design firm for Sidewalk Along Beltway 8 Northbound Frontage Rd.?

Omega Engineers, Inc. is the design firm of record for Sidewalk Along Beltway 8 Northbound Frontage Rd., according to its TDLR filing.

How much does Sidewalk Along Beltway 8 Northbound Frontage Rd. cost and how big is it?

Sidewalk Along Beltway 8 Northbound Frontage Rd. has an estimated construction value of $44.5M and approximately 5,000 square feet (about $8.89K/sqft), based on its TDLR filing.

Scope of Work

Construction of sidewalks & ADA ramps, consisting of grading, base, Pavement and Landscaping

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

BW8 N From Wallisville Rd. to Auburn Knoll Ave, Houston, TX, 77049

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77049 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.