Project intelligenceTDLR TABS2020015810New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2018 Bond Group A Bicentennial Bridge Impvts

Harvey,, Highland,,La Vista, and Tamarack Ave., Mcallen, TX, 78501

Target date passed (Jun 2021)Review Complete

2018 Bond Group A Bicentennial Bridge Impvts is a new construction project at Harvey,, Highland,,La Vista, and Tamarack Ave., Mcallen, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2021 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $225K across about 4,360 sq ft.

Estimated project value
$225K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,360 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$52/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 1, 2020426 days across supplied datesJun 1, 2021

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    16 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    410 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78501 (Mcallen)

One email per change. Unsubscribe in one click. Privacy.

2018 Bond Group A Bicentennial Bridge Impvts is a New Construction project located at Harvey,, Highland,,La Vista, and Tamarack Ave., Mcallen, TX 78501 in Mcallen, Texas. The project has an estimated value of $225K covering 4,360 sq ft. City of McAllen is the property owner and Halff Associates, Inc. is the design firm of record. The project was registered with TDLR on April 17, 2020.

Frequently Asked Questions

What is 2018 Bond Group A Bicentennial Bridge Impvts?

2018 Bond Group A Bicentennial Bridge Impvts is a new construction project at Harvey,, Highland,,La Vista, and Tamarack Ave. in Mcallen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks and ramps at new bridge crossings.

Is 2018 Bond Group A Bicentennial Bridge Impvts open in Mcallen?

2018 Bond Group A Bicentennial Bridge Impvts was scheduled to finish construction in Jun 2021 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is 2018 Bond Group A Bicentennial Bridge Impvts located?

2018 Bond Group A Bicentennial Bridge Impvts is located at Harvey,, Highland,,La Vista, and Tamarack Ave., Mcallen, TX, 78501, in Hidalgo County.

Who is the owner or developer of 2018 Bond Group A Bicentennial Bridge Impvts?

City of McAllen is the property owner/developer of record for 2018 Bond Group A Bicentennial Bridge Impvts, per its TDLR project registration.

Who is the architect or design firm for 2018 Bond Group A Bicentennial Bridge Impvts?

Halff Associates, Inc. is the design firm of record for 2018 Bond Group A Bicentennial Bridge Impvts, according to its TDLR filing.

How much does 2018 Bond Group A Bicentennial Bridge Impvts cost and how big is it?

2018 Bond Group A Bicentennial Bridge Impvts has an estimated construction value of $225K and approximately 4,360 square feet (about $52/sqft), based on its TDLR filing.

Scope of Work

Sidewalks and ramps at new bridge crossings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Harvey,, Highland,,La Vista, and Tamarack Ave., Mcallen, TX, 78501

Location by street address

Watch all construction in 78501 (Mcallen)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.