Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
PKG025 Site Work Renovation at Armstrong Elementary in Missouri City, TX
3440 Independence Blvd, Missouri City, TX, 77459
PKG025 Site Work Renovation at Armstrong Elementary is a renovation/alteration project at 3440 Independence Blvd, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2021). The project has an estimated value of $54K across about 1 sq ft.
- Estimated project value
- $54K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $54.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
10 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
426 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77459 (Missouri City)
One email per change. Unsubscribe in one click. Privacy.
PKG025 Site Work Renovation at Armstrong Elementary is a Renovation/Alteration project located at 3440 Independence Blvd, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $54K covering 1 sq ft. Fort Bend Independent School District is the property owner and Huitt-Zollars, Inc is the design firm of record. The project was registered with TDLR on April 21, 2020.
Frequently Asked Questions
What is PKG025 Site Work Renovation at Armstrong Elementary?
PKG025 Site Work Renovation at Armstrong Elementary is a renovation/alteration project at 3440 Independence Blvd in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: project generally consists of site grading, sidewalks,installation & repair of storm sewer lines, inlets, connecting the existing irrigation system from onsite wells to public water supply, pave repair, concrete parking lot & detention p…
Is PKG025 Site Work Renovation at Armstrong Elementary open in Missouri City?
Construction on PKG025 Site Work Renovation at Armstrong Elementary is complete — TDLR records show the project passed its required accessibility inspection in Jul 2021. The building is finished and very likely open.
Where is PKG025 Site Work Renovation at Armstrong Elementary located?
PKG025 Site Work Renovation at Armstrong Elementary is located at 3440 Independence Blvd, Missouri City, TX, 77459, in Fort Bend County.
Who is the owner or developer of PKG025 Site Work Renovation at Armstrong Elementary?
Fort Bend Independent School District is the property owner/developer of record for PKG025 Site Work Renovation at Armstrong Elementary, per its TDLR project registration.
Who is the architect or design firm for PKG025 Site Work Renovation at Armstrong Elementary?
Huitt-Zollars, Inc is the design firm of record for PKG025 Site Work Renovation at Armstrong Elementary, according to its TDLR filing.
How much does PKG025 Site Work Renovation at Armstrong Elementary cost and how big is it?
PKG025 Site Work Renovation at Armstrong Elementary has an estimated construction value of $54K and approximately 1 square feet (about $54.00K/sqft), based on its TDLR filing.
Scope of Work
project generally consists of site grading, sidewalks,installation & repair of storm sewer lines, inlets, connecting the existing irrigation system from onsite wells to public water supply, pave repair, concrete parking lot & detention pond.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3440 Independence Blvd, Missouri City, TX, 77459
Related Projects
Same Owner
$47.53B totalWatch all construction in 77459 (Missouri City)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Missouri City?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.