Project intelligenceTDLR TABS2020016307New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Brownfield High School Package 3-Building and Site Work

702 N. Cub Drive, Brownfield, TX, 79316

Construction complete · Jun 2022Project Closed

Brownfield High School Package 3-Building and Site Work is a new construction project at 702 N. Cub Drive, Brownfield, in Terry County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2022). The project has an estimated value of $32.7M across about 146,000 sq ft.

Estimated project value
$32.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
146,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$224/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 27, 2020794 days across supplied datesJun 30, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    22 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    772 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79316 (Brownfield)

One email per change. Unsubscribe in one click. Privacy.

Brownfield High School Package 3-Building and Site Work is a New Construction project located at 702 N. Cub Drive, Brownfield, TX 79316 in Brownfield, Texas. The project has an estimated value of $32.7M covering 146,000 sq ft. Brownfield Independent School District is the property owner and Parkhill, Smith & Cooper, Inc. is the design firm of record. The project was registered with TDLR on April 27, 2020.

Frequently Asked Questions

What is Brownfield High School Package 3-Building and Site Work?

Brownfield High School Package 3-Building and Site Work is a new construction project at 702 N. Cub Drive in Brownfield, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 146,000 sq. ft. High School, conventional construction, with a sunken gym and lower level. Pre-engineered metal bldg. auxiliary gym attached as well as a votect/career technology pre-engineered metal bldg. attached.

Is Brownfield High School Package 3-Building and Site Work open in Brownfield?

Construction on Brownfield High School Package 3-Building and Site Work is complete — TDLR records show the project passed its required accessibility inspection in Jun 2022. The building is finished and very likely open.

Where is Brownfield High School Package 3-Building and Site Work located?

Brownfield High School Package 3-Building and Site Work is located at 702 N. Cub Drive, Brownfield, TX, 79316, in Terry County.

Who is the owner or developer of Brownfield High School Package 3-Building and Site Work?

Brownfield Independent School District is the property owner/developer of record for Brownfield High School Package 3-Building and Site Work, per its TDLR project registration.

Who is the architect or design firm for Brownfield High School Package 3-Building and Site Work?

Parkhill, Smith & Cooper, Inc. is the design firm of record for Brownfield High School Package 3-Building and Site Work, according to its TDLR filing.

How much does Brownfield High School Package 3-Building and Site Work cost and how big is it?

Brownfield High School Package 3-Building and Site Work has an estimated construction value of $32.7M and approximately 146,000 square feet (about $224/sqft), based on its TDLR filing.

Scope of Work

New 146,000 sq. ft. High School, conventional construction, with a sunken gym and lower level. Pre-engineered metal bldg. auxiliary gym attached as well as a votect/career technology pre-engineered metal bldg. attached.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

702 N. Cub Drive, Brownfield, TX, 79316

Loading location map…
33.18669, -102.25942

Watch all construction in 79316 (Brownfield)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Brownfield?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.