Project intelligenceTDLR TABS2020016737Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Renovations to Trimble Tech High School

1003 West Cannon Street, Fort Worth, TX, 76104

Construction complete · Dec 2022Inspection Complete

Renovations to Trimble Tech High School is a renovation/alteration project at 1003 West Cannon Street, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2022). The project has an estimated value of $25.0M across about 275,000 sq ft.

Estimated project value
$25.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
275,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$91/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 4, 2020955 days across supplied datesDec 15, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    120 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    835 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76104 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Renovations to Trimble Tech High School is a Renovation/Alteration project located at 1003 West Cannon Street, Fort Worth, TX 76104 in Fort Worth, Texas. The project has an estimated value of $25.0M covering 275,000 sq ft. Fort Worth Independent School District is the property owner and Fender-Andrade Architects is the design firm of record. The project was registered with TDLR on May 4, 2020.

Frequently Asked Questions

What is Renovations to Trimble Tech High School?

Renovations to Trimble Tech High School is a renovation/alteration project at 1003 West Cannon Street in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovations to an historic school building

Is Renovations to Trimble Tech High School open in Fort Worth?

Construction on Renovations to Trimble Tech High School is complete — TDLR records show the project passed its required accessibility inspection in Dec 2022. The building is finished and very likely open.

Where is Renovations to Trimble Tech High School located?

Renovations to Trimble Tech High School is located at 1003 West Cannon Street, Fort Worth, TX, 76104, in Tarrant County.

Who is the owner or developer of Renovations to Trimble Tech High School?

Fort Worth Independent School District is the property owner/developer of record for Renovations to Trimble Tech High School, per its TDLR project registration.

Who is the architect or design firm for Renovations to Trimble Tech High School?

Fender-Andrade Architects is the design firm of record for Renovations to Trimble Tech High School, according to its TDLR filing.

How much does Renovations to Trimble Tech High School cost and how big is it?

Renovations to Trimble Tech High School has an estimated construction value of $25.0M and approximately 275,000 square feet (about $91/sqft), based on its TDLR filing.

Scope of Work

Interior renovations to an historic school building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1003 West Cannon Street, Fort Worth, TX, 76104

Location by street address

Related City Permits

Building permits found at or near this location

1003 W CANNON ST, Fort Worth, TX 76104
ExpiredPlumbing BackflowBackflowNov 2025
FTW-PP25-19850

Watch all construction in 76104 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.