811 Main - Tunnel Level Capital Improvements - Phase 2 is a renovation/alteration project at 811 Main Street, Level B1, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2021). The project has an estimated value of $750K across about 5,630 sq ft.
Project has been completed and closed
811 Main - Tunnel Level Capital Improvements - Phase 2 is a Renovation/Alteration project located at 811 Main Street, Level B1, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $750K covering 5,630 sq ft. BG HOLDCO LLC is the property owner and Ziegler-Cooper, Inc. is the design firm of record. The project was registered with TDLR on May 11, 2020.
811 Main - Tunnel Level Capital Improvements - Phase 2 is a renovation/alteration project at 811 Main Street, Level B1 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing interior construction
Construction on 811 Main - Tunnel Level Capital Improvements - Phase 2 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2021. The building is finished and very likely open.
811 Main - Tunnel Level Capital Improvements - Phase 2 is located at 811 Main Street, Level B1, Houston, TX, 77002, in Harris County.
BG HOLDCO LLC is the property owner/developer of record for 811 Main - Tunnel Level Capital Improvements - Phase 2, per its TDLR project registration.
Ziegler-Cooper, Inc. is the design firm of record for 811 Main - Tunnel Level Capital Improvements - Phase 2, according to its TDLR filing.
811 Main - Tunnel Level Capital Improvements - Phase 2 has an estimated construction value of $750K and approximately 5,630 square feet (about $133/sqft), based on its TDLR filing.
Interior renovation of existing interior construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 11, 2020
Review Complete
Inspection Complete
Closed
Mar 1, 2021