Thompson & Horton - Austin Office Renovation
Thompson & Horton - Austin Office Renovation is a renovation/alteration project at 8300 North Mopac Expressway, Suite 220 8911 N Capital of Texas Hwy, Suite 1100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $160K across about 2,889 sq ft.
๐Project Metrics
TDLR #TABS2020017162Review Complete
Design review complete, construction may proceed
Thompson & Horton - Austin Office Renovation is a Renovation/Alteration project located at 8300 North Mopac Expressway, Suite 220 8911 N Capital of Texas Hwy, Suite 1100,, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $160K covering 2,889 sq ft. Divco West Real Estate Services, Inc. is the property owner and Perkins and Will is the design firm of record. The project was registered with TDLR on May 11, 2020.
โFrequently Asked Questions
What is Thompson & Horton - Austin Office Renovation?
Thompson & Horton - Austin Office Renovation is a renovation/alteration project at 8300 North Mopac Expressway, Suite 220 8911 N Capital of Texas Hwy, Suite 1100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing office suite.
Is Thompson & Horton - Austin Office Renovation open in Austin?
Thompson & Horton - Austin Office Renovation is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Thompson & Horton - Austin Office Renovation located?
Thompson & Horton - Austin Office Renovation is located at 8300 North Mopac Expressway, Suite 220 8911 N Capital of Texas Hwy, Suite 1100, Austin, TX, 78759, in Travis County.
Who is the owner or developer of Thompson & Horton - Austin Office Renovation?
Divco West Real Estate Services, Inc. is the property owner/developer of record for Thompson & Horton - Austin Office Renovation, per its TDLR project registration.
Who is the architect or design firm for Thompson & Horton - Austin Office Renovation?
Perkins and Will is the design firm of record for Thompson & Horton - Austin Office Renovation, according to its TDLR filing.
How much does Thompson & Horton - Austin Office Renovation cost and how big is it?
Thompson & Horton - Austin Office Renovation has an estimated construction value of $160K and approximately 2,889 square feet (about $55/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing office suite.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 11, 2020
Review Complete
May 11, 2020
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work
EXPRESS: Foundation repair
Addition of a rear patio cover - minor electrical
PROJECT SCOPE Provide one new dedicated AFCI/GFCI protected 20A 120V branch circuit from the main panel on the exterior wall of the house to a new kitchen range hood. No meter work being performed. INSTALLATION DETAILS Install a vertical 1-inch Steel EMT raceway exiting the main electrical panel from a 1-inch LR conduit body (located below all energized parts) on the homes exterior brick wall. Transition raceway to horizontal orientation for building penetration using a 1 LB. Penetrate into the accessible attic with 1 EMT terminating into a 4-11/16 steel junction box with a blank cover. Install #10-2 UF-B cable (1 HOT 1 NEUTRAL 1 EGC) (Sunlight Resistant/Wet Location rated) from the range hood to the steel junction box. Cable will be routed along ceiling rafters; any portion below 7 will be protected by guard strips per NEC 320.23. The #10-2 UF-B will be sleeved continuously from the 4-11/16 junction box through the LB down the vertical EMT and through the LR terminating directly into the main panel . This avoids all splices providing a continuous run from the OCPD to the appliance. CODE COMPLIANCE NOTES: 10 AWG conductors are specd. for this 20A circuit to account for ambient temperature correction in the unconditioned attic and sun-exposed exterior raceway. The EMT will be sealed with duct seal at the attic box and panel entry to prevent moisture migration and condensation per NEC 300.7. All cables and raceways will be supported/secured per NEC. All exterior fittings/hardware will be UL-listed rain-tight compression type. All cables and raceways will be supported and secured per NEC requirements. An insulated throat fitting or plastic bushing will be used at all EMT entry points to protect the cable jacket from abrasion. All wire terminations will be torqued to the manufacturer specifications per 2023 NEC 110.14(D)