Project intelligenceTDLR TABS2020017188New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MWP ISD New Elementary School

East of Monahans Parkway, between 9th and 7th St., Monahans, TX, 79756

Construction complete · Jul 2022Project Closed

MWP ISD New Elementary School is a new construction project at East of Monahans Parkway, between 9th and 7th St., Monahans, in Ward County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $34.0M across about 120,000 sq ft.

Estimated project value
$34.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
120,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$283/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 12, 2020794 days across supplied datesJul 15, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    50 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    744 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79756 (Monahans)

One email per change. Unsubscribe in one click. Privacy.

MWP ISD New Elementary School is a New Construction project located at East of Monahans Parkway, between 9th and 7th St., Monahans, TX 79756 in Monahans, Texas. The project has an estimated value of $34.0M covering 120,000 sq ft. Monahans-Wickett-Pyote ISD (Chad Smith) is the property owner and Parkhill, Smith & Cooper, Inc. (RJ Lopez/sm) is the design firm of record. The project was registered with TDLR on May 12, 2020.

Frequently Asked Questions

What is MWP ISD New Elementary School?

MWP ISD New Elementary School is a new construction project at East of Monahans Parkway, between 9th and 7th St. in Monahans, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Design a new future ready 3rd-6th grade Elementary School at approximately 120,000 square feet. Design student population is to be 900 students. The school will be compartmentalized into two separate 450 student elementary schools

Is MWP ISD New Elementary School open in Monahans?

Construction on MWP ISD New Elementary School is complete — TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.

Where is MWP ISD New Elementary School located?

MWP ISD New Elementary School is located at East of Monahans Parkway, between 9th and 7th St., Monahans, TX, 79756, in Ward County.

Who is the owner or developer of MWP ISD New Elementary School?

Monahans-Wickett-Pyote ISD (Chad Smith) is the property owner/developer of record for MWP ISD New Elementary School, per its TDLR project registration.

Who is the architect or design firm for MWP ISD New Elementary School?

Parkhill, Smith & Cooper, Inc. (RJ Lopez/sm) is the design firm of record for MWP ISD New Elementary School, according to its TDLR filing.

How much does MWP ISD New Elementary School cost and how big is it?

MWP ISD New Elementary School has an estimated construction value of $34.0M and approximately 120,000 square feet (about $283/sqft), based on its TDLR filing.

Scope of Work

Design a new future ready 3rd-6th grade Elementary School at approximately 120,000 square feet. Design student population is to be 900 students. The school will be compartmentalized into two separate 450 student elementary schools

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

East of Monahans Parkway, between 9th and 7th St., Monahans, TX, 79756

Location by street address

Related Projects

Watch all construction in 79756 (Monahans)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Monahans?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.