Funding type
This project is privately funded, on private land for private use.
Starbucks Shell
E. End Blvd N and Houston St, Marshall, TX, 75670
Starbucks Shell is a new construction project at E. End Blvd N and Houston St, Marshall, in Harrison County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $600K across about 2,000 sq ft.
- Estimated project value
- $600K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $300/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
26 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
180 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75670 (Marshall)
One email per change. Unsubscribe in one click. Privacy.
Starbucks Shell is a New Construction project located at E. End Blvd N and Houston St, Marshall, TX 75670 in Marshall, Texas. The project has an estimated value of $600K covering 2,000 sq ft. HENSON PROPERTY GROUP LLC is the property owner and THOMAS A PIRTLE III is the design firm of record. The project was registered with TDLR on May 20, 2020.
Frequently Asked Questions
What is Starbucks Shell?
Starbucks Shell is a new construction project at E. End Blvd N and Houston St in Marshall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Shell building of future Starbucks
Is Starbucks Shell open in Marshall?
Starbucks Shell was scheduled to finish construction in Dec 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Starbucks Shell located?
Starbucks Shell is located at E. End Blvd N and Houston St, Marshall, TX, 75670, in Harrison County.
Who is the owner or developer of Starbucks Shell?
HENSON PROPERTY GROUP LLC is the property owner/developer of record for Starbucks Shell, per its TDLR project registration.
Who is the architect or design firm for Starbucks Shell?
THOMAS A PIRTLE III is the design firm of record for Starbucks Shell, according to its TDLR filing.
How much does Starbucks Shell cost and how big is it?
Starbucks Shell has an estimated construction value of $600K and approximately 2,000 square feet (about $300/sqft), based on its TDLR filing.
Scope of Work
Shell building of future Starbucks
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
E. End Blvd N and Houston St, Marshall, TX, 75670
Related Projects
Nearby Projects
Within 1 kmWatch all construction in 75670 (Marshall)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Marshall?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.