Project intelligenceTDLR TABS2020018034Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

WAXAHACHIE EXPRESS WASH TUNNEL ADDITION

111 N. HWY 77, Waxahachie, TX, 75165

Construction complete · Oct 2020Project Closed

WAXAHACHIE EXPRESS WASH TUNNEL ADDITION is a renovation/alteration project at 111 N. HWY 77, Waxahachie, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2020). The project has an estimated value of $200K across about 675 sq ft.

Estimated project value
$200K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
675 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$296/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 28, 2020126 days across supplied datesOct 1, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75165 (Waxahachie)

One email per change. Unsubscribe in one click. Privacy.

WAXAHACHIE EXPRESS WASH TUNNEL ADDITION is a Renovation/Alteration project located at 111 N. HWY 77, Waxahachie, TX 75165 in Waxahachie, Texas. The project has an estimated value of $200K covering 675 sq ft. RYAN HALL - HALL EQUITIES, LTD. is the property owner and WARD ARCHITECTURE PLLC. is the design firm of record. The project was registered with TDLR on May 28, 2020.

Frequently Asked Questions

What is WAXAHACHIE EXPRESS WASH TUNNEL ADDITION?

WAXAHACHIE EXPRESS WASH TUNNEL ADDITION is a renovation/alteration project at 111 N. HWY 77 in Waxahachie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ADDITION OF NEW CAR WASH TUNNEL TO EXISTING CAR WASH BUILDING, AND ASSOCIATED SITE IMPROVEMENTS.

Is WAXAHACHIE EXPRESS WASH TUNNEL ADDITION open in Waxahachie?

Construction on WAXAHACHIE EXPRESS WASH TUNNEL ADDITION is complete — TDLR records show the project passed its required accessibility inspection in Oct 2020. The building is finished and very likely open.

Where is WAXAHACHIE EXPRESS WASH TUNNEL ADDITION located?

WAXAHACHIE EXPRESS WASH TUNNEL ADDITION is located at 111 N. HWY 77, Waxahachie, TX, 75165, in Ellis County.

Who is the owner or developer of WAXAHACHIE EXPRESS WASH TUNNEL ADDITION?

RYAN HALL - HALL EQUITIES, LTD. is the property owner/developer of record for WAXAHACHIE EXPRESS WASH TUNNEL ADDITION, per its TDLR project registration.

Who is the architect or design firm for WAXAHACHIE EXPRESS WASH TUNNEL ADDITION?

WARD ARCHITECTURE PLLC. is the design firm of record for WAXAHACHIE EXPRESS WASH TUNNEL ADDITION, according to its TDLR filing.

How much does WAXAHACHIE EXPRESS WASH TUNNEL ADDITION cost and how big is it?

WAXAHACHIE EXPRESS WASH TUNNEL ADDITION has an estimated construction value of $200K and approximately 675 square feet (about $296/sqft), based on its TDLR filing.

Scope of Work

ADDITION OF NEW CAR WASH TUNNEL TO EXISTING CAR WASH BUILDING, AND ASSOCIATED SITE IMPROVEMENTS.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

111 N. HWY 77, Waxahachie, TX, 75165

Location by street address

Watch all construction in 75165 (Waxahachie)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Waxahachie?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.