Project intelligenceTDLR TABS2020018424New Construction
Funding type

This project is privately funded, on private land for private use.

Floresville Electric & Power System-New Headquarters

187 State Hwy. 97 East, Floresville, TX, 78114

Construction complete · Aug 2021Inspection Complete

Floresville Electric & Power System-New Headquarters is a new construction project at 187 State Hwy. 97 East, Floresville, in Wilson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2021). The project has an estimated value of $13.0M across about 33,868 sq ft.

Estimated project value
$13.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
33,868 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$384/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 1, 2020456 days across supplied datesAug 31, 2021

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    454 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78114 (Floresville)

One email per change. Unsubscribe in one click. Privacy.

Floresville Electric & Power System-New Headquarters is a New Construction project located at 187 State Hwy. 97 East, Floresville, TX 78114 in Floresville, Texas. The project has an estimated value of $13.0M covering 33,868 sq ft. Floresville Electric Light & Power System is the property owner and C.H. Guernsey & C.O. is the design firm of record. The project was registered with TDLR on June 3, 2020.

Frequently Asked Questions

What is Floresville Electric & Power System-New Headquarters?

Floresville Electric & Power System-New Headquarters is a new construction project at 187 State Hwy. 97 East in Floresville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New green site construction of 27723 single story office complex including warehouse and 6145sf single story vehicle maintenance shop, pole lay down yard and overall site storage and circulation area.

Is Floresville Electric & Power System-New Headquarters open in Floresville?

Construction on Floresville Electric & Power System-New Headquarters is complete — TDLR records show the project passed its required accessibility inspection in Aug 2021. The building is finished and very likely open.

Where is Floresville Electric & Power System-New Headquarters located?

Floresville Electric & Power System-New Headquarters is located at 187 State Hwy. 97 East, Floresville, TX, 78114, in Wilson County.

Who is the owner or developer of Floresville Electric & Power System-New Headquarters?

Floresville Electric Light & Power System is the property owner/developer of record for Floresville Electric & Power System-New Headquarters, per its TDLR project registration.

Who is the architect or design firm for Floresville Electric & Power System-New Headquarters?

C.H. Guernsey & C.O. is the design firm of record for Floresville Electric & Power System-New Headquarters, according to its TDLR filing.

How much does Floresville Electric & Power System-New Headquarters cost and how big is it?

Floresville Electric & Power System-New Headquarters has an estimated construction value of $13.0M and approximately 33,868 square feet (about $384/sqft), based on its TDLR filing.

Scope of Work

New green site construction of 27723 single story office complex including warehouse and 6145sf single story vehicle maintenance shop, pole lay down yard and overall site storage and circulation area.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

187 State Hwy. 97 East, Floresville, TX, 78114

Loading location map…
29.11712, -98.16244

Watch all construction in 78114 (Floresville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Floresville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.