N Beach St & Basswood Blvd Intersection Improvements
N Beach St & Basswood Blvd Intersection, Fort Worth, TX, 76137
N Beach St & Basswood Blvd Intersection Improvements is a renovation/alteration project at N Beach St & Basswood Blvd Intersection, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2021). The project has an estimated value of $91K across about 60,388 sq ft.
- Estimated project value
- $91K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 60,388 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
281 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
166 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76137 (Fort Worth)
One email per change. Unsubscribe in one click. Privacy.
N Beach St & Basswood Blvd Intersection Improvements is a Renovation/Alteration project located at N Beach St & Basswood Blvd Intersection, Fort Worth, TX 76137 in Fort Worth, Texas. The project has an estimated value of $91K covering 60,388 sq ft. City of Fort Worth is the property owner and Pape-Dawson Engineers is the design firm of record. The project was registered with TDLR on June 4, 2020.
Frequently Asked Questions
What is N Beach St & Basswood Blvd Intersection Improvements?
N Beach St & Basswood Blvd Intersection Improvements is a renovation/alteration project at N Beach St & Basswood Blvd Intersection in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal & replacement of 7 ADA ramps & ADA crossings; installation of pedestrian signals & audible pedestrian stations
Is N Beach St & Basswood Blvd Intersection Improvements open in Fort Worth?
Construction on N Beach St & Basswood Blvd Intersection Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2021. The building is finished and very likely open.
Where is N Beach St & Basswood Blvd Intersection Improvements located?
N Beach St & Basswood Blvd Intersection Improvements is located at N Beach St & Basswood Blvd Intersection, Fort Worth, TX, 76137, in Tarrant County.
Who is the owner or developer of N Beach St & Basswood Blvd Intersection Improvements?
City of Fort Worth is the property owner/developer of record for N Beach St & Basswood Blvd Intersection Improvements, per its TDLR project registration.
Who is the architect or design firm for N Beach St & Basswood Blvd Intersection Improvements?
Pape-Dawson Engineers is the design firm of record for N Beach St & Basswood Blvd Intersection Improvements, according to its TDLR filing.
How much does N Beach St & Basswood Blvd Intersection Improvements cost and how big is it?
N Beach St & Basswood Blvd Intersection Improvements has an estimated construction value of $91K and approximately 60,388 square feet (about $2/sqft), based on its TDLR filing.
Scope of Work
Removal & replacement of 7 ADA ramps & ADA crossings; installation of pedestrian signals & audible pedestrian stations
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Related Projects
Same Owner
$1.67B totalWatch all construction in 76137 (Fort Worth)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.