Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations
624 Malone Drive, Center, TX, 75935
Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations is a additions to existing building project at 624 Malone Drive, Center, in Shelby County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2022). The project has an estimated value of $7.0M across about 13,708 sq ft.
- Estimated project value
- $7.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 13,708 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $511/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
54 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
577 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75935 (Center)
One email per change. Unsubscribe in one click. Privacy.
Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations is a Additions to Existing Building project located at 624 Malone Drive, Center, TX 75935 in Center, Texas. The project has an estimated value of $7.0M covering 13,708 sq ft. Center ISD represented by Dr. Brian Morris, Superintendent is the property owner. The project was registered with TDLR on June 8, 2020.
Frequently Asked Questions
What is Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations?
Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations is a additions to existing building project at 624 Malone Drive in Center, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add new classrooms and Band Hall; renovation & addition to existing cafeteria; maintenance of existing Science Bldg.
Is Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations open in Center?
Construction on Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations is complete — TDLR records show the project passed its required accessibility inspection in Mar 2022. The building is finished and very likely open.
Where is Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations located?
Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations is located at 624 Malone Drive, Center, TX, 75935, in Shelby County.
Who is the owner or developer of Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations?
Center ISD represented by Dr. Brian Morris, Superintendent is the property owner/developer of record for Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations, per its TDLR project registration.
How much does Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations cost and how big is it?
Center ISD 2018 Bond Imp. PKG F2 - Middle School Additions & Renovations has an estimated construction value of $7.0M and approximately 13,708 square feet (about $511/sqft), based on its TDLR filing.
Scope of Work
Add new classrooms and Band Hall; renovation & addition to existing cafeteria; maintenance of existing Science Bldg.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
624 Malone Drive, Center, TX, 75935
Related Projects
Watch all construction in 75935 (Center)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.