Project has been completed and closed
Cele Middle School Track and Field Renovation is a Renovation/Alteration project located at 6000 Cele Rd., Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $361K covering 10 sq ft. Pflugerville ISD is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on June 29, 2020.
The work includes track resurfacing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 29, 2020
Review Complete
Inspection Complete
Closed
Aug 9, 2020
Building permits found at or near this location
Occupant load card increase request from 23 to 32 for existing child care center.
Replacement of complete existing central heat and air system with or without duct work
200-amp overhead service upgrade
Pool - construction of new pool with concrete deck and equipment pad. 300 sf
Pool - construction of new pool with concrete deck and equipment pad. 300 sf